Full Project – A STUDY OF QUANTITY SURVEYOR’S PERCEPTION ON FACILITY IN THE NIGER DELTA AREA OF NIGERIA

Full Project – A STUDY OF QUANTITY SURVEYOR’S PERCEPTION ON FACILITY IN THE NIGER DELTA AREA OF NIGERIA

Click here to Get this Complete Project Chapter 1-5

CHAPTER ONE

INTRODUCTION

  • Background of the Study

Construction of a project consists of the integration of professionals, contractors and client(s) and the other participants, manufacturers, suppliers and government bodies.          Walker (2002) affirmed that construction industry is essentially a service industry whose responsibility is to convert the plan and specifications prepared by engineers and/or architects into shed projects. Construction includes activities such as alteration, building, relocation, decoration, demolition, renovation maintenance, repairs of buildings, roads, structures, sewers water or gas main pipelines, transmission lines, tunnels, bridges canals and other associated works.    Atkin (2000), stated that “facility management is the management of building services. It is a relatively new profession in the Niger Delta region of Nigeria”. Adedeji (2005) affirmed “facilities management has been in existence in Nigeria for the past ten years on professional level with the introduction of International Facilities Management Association (IFMA) in Nigeria”.

The International Facilities Management Association (IFMA) defined Facilities Management  (FM) as “the integration of processes within an organisation to maintain and develop the agreed services, which support and improve the effectiveness of its primary activities. The British Institute of facilities management has a wider scope of meaning than simply “the management of buildings and services” it defined facilities management as the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace”. The definition above offers a slightly simpler description of the term facilities management. A well simplified definition of facilities management was propounded by Ramsey (2001). He stated that “facilities management is a process of managing al the multiple services that enable a facility to become a profitable investment for its owners and a productive environment for its users”. Facility management depends upon the skill, vision, experience of the practitioners Nnachi (2007) and Okezie (2007). DeLucy (1989) stated that “the facility manager can then make all necessary decisions concerning systems, services and supplies, so that the facility can be run at a productive level for owner users”

Facilities management as an antecedent in property management  and maintenance could be said to mean “the supervising, directing and the controlling of interest in landed property with a view to obtaining the possible maximum return, which in most cases is financial but could also be political, social status, prestige or any management objectives, which an investor chooses (Obelender, 2000). It is on this background that this study was   carried out.

1.2     Statement of Problem

As facility management is a very important subject of debate in the construction industry, there exists an argument in who should play this role in the Industry. Other professionals such as the engineers, builders, architects and estate values admit that the Quantity Surveyor should be involved in facilities management. Study reveals that among these professional, the Quantity Surveyor has the upper edge to play the leading role based on his vast and versatile knowledge in cost engineering, which deals with both construction cost and maintenance or running cost of engineering, which deals with both construction cost and maintenance or running cost of socio-infrastructural facilities, that need proper management. One, therefore, argues whether or not the quantity surveyor with all these attributes and qualities is qualified to perform this important role in the construction industry. To this end therefore, it is highly important to investigate into the perception of the Quantity Surveyor on facilities management in the Niger Delta area of Nigeria.

1.3     Aim and Objectives of the Study

The researcher sought to investigate the perception of the Quantity Surveyor on facility management in the construction industry.

The specific objectives were:

  1. To identify the factors that qualify a quantity surveyor as a facility manager.
  2. To access the factors that affect the effective facilities management practices in Nigeria.
  3. To examine the level of involvement of the Quantity Surveyor in the facilities management practice.

1.4     Significance of Study

The outcome of the study will be of immense value to practicing Quantity Surveyor and other allied professionals who are willing to forge ahead into the discipline of facilities management. The study will also be relevant to all professionals, government and other stakeholders involved in the construction industry.

1.5     Research Questions

This research work set to answer the following questions:

  1. Is facility management relevant in the construction industry?
  2. Does the construction industry employ a facility manager?
  3. What role should Quantity Surveyors play for effective facilities management?
  4. What are the qualities required by a Quantity Surveyor to make him the best professional for facilities management?

1.6     Scope of Study

This research work was carried out in the Niger Delta region of Nigeria. The study was limited to both socio-economic and infrastructural facilities that were executed between 2000 and 2006.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

 

 

 

Need a Project Writer for a Different Topic

 

Full Project – A STUDY OF QUANTITY SURVEYOR’S PERCEPTION ON FACILITY IN THE NIGER DELTA AREA OF NIGERIA

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | Https://researchprojecttopics.com.ng

Frequently Asked Questions

How do I get my choice complete project on any topic?
Simply click on the Download button above and follow the procedure stated.
I have a fresh topic that is not on your website. How do I go about it?
Chat with us on WhatsApp or contact our Instant Help Desk for a custom research project on your topic.
How fast can I get this complete project on any project topic?
Within 15 minutes if you want this exact project topic without adjustment.
Is it a complete research project or just materials?
It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data.
What if I want to change the case study for this topic?
Chat with Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
How will I get my complete project?
Your Complete Project Material will be sent to your Email Address in Ms Word document format.
Can I get my Complete Project through WhatsApp?
Yes! We can send your Complete Research Project to your WhatsApp Number.
What if my Project Supervisor made some changes to a topic I picked from your website?
Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
Do you assist students with Assignment and Project Proposal?
Yes! Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
What if I do not have any project topic idea at all?
Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 708 7083 227.
How can I trust this site?
We are genuine and duly registered with the Corporate Affairs Commission. This site runs on Secure Sockets Layer (SSL), ensuring all transactions are highly secure and safe.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!