Full Project – CONTRIBUTIONS OF PURCHASING AND STOCK CONTROL IN COSTS REDUCTION

Full Project – CONTRIBUTIONS OF PURCHASING AND STOCK CONTROL IN COSTS REDUCTION

Click here to Get this Complete Project Chapter 1-5

ABSTRACT

This project on the contributions of purchasing and stock control in cost reduction. Purchasing and survival, get purchasing the wrong material or carrying too little can be catastrophic for the organization. The question then is, what is the ideal level of the stock control to carry? These are some of the questions the purchasing manager is expected to answer and they will be the focuss project. In chapter one, introduction of what purchasing and stock control is all what and well explained, background of the study, statement of problem, objective of the study, both limitation of study and definition of the terms were well explained. In chapter three the design used in conducting various researches was described showing the methods used in collecting data during the researcher eg primary method and the secondary method. In chapter four the data was analyzed and presented accurately and clearly with the use of tables. Lastly, chapter five is made up of summary of findings from research work conclusion and recommendation have been made as to know how the various problems could be averted.

 

CHAPTER ONE

1.0 INTRODUCTION

1.1 BACKGROUND TO THE STUDY

Purchasing and store form the main important area in many organizations especially in the manufacturing sector. However, given the average, manufacturing company disposes more than half of its income on materials supplies and service. The important of procurement as a key function in the management of business can be emphasized by considering the total cost of materials tend in many cases to account for an increasing proportion of product. Also the problems encountered in connection with materials are tendering to become more difficult and more numerous than was previously the case. The term materials is used in general sense and refers to the whole range of goods and services which are used purchased or produced from sources outside the organization and are distributed or processed in order to provide finish products for sales.

Purchasing has long been considered one of the basic functions common to all organization long before the large organization appeared with functionally specialized department, people bought and sold. Buying, that is acquiring goods and services in return for a price, dates back before the invention of written records. This is the same thing with selling which is the disposal of goods and services in return for a price.  It is likely that human communicates, have always bought and sold and that culturally and materially they have benefited form these transaction.

1.2 STATEMENT OF PROBLEMS

Industries are charged with the responsibility of producing goods of high quality and standard at a very reduced and affordable cost to the citizen. Materials in this respect become so vital that no result could be achieved without a good procurement. In the topic “ The CONTRIBUTION OF PURCHASING AND STOCK CONTROL IN COSTS REDUCTION” Nigerian Breweries PLC, as the case study is faced with the following problems. (1) There is the need for the purchasing department to have a good knowledge it stock control and better understanding of its specification requirement  (2) The research is faced with the problem of working out modalities for the improvement of the purchase of the right quality. (3) Research should be conducted to find out specifically the role of purchasing in a manufacturing company. (4) Good numbers of manufacturing firm to not take their regularly and this practice could give chance for dishonest and unreliable workers to defraud their companies (5) There is also a problem of unprofessionally in purchasing function.

1.3 OBJECTIVES OF THE STUDY

The main reasons behind my undertaking of this research are

(1) To find out to what extent an efficient stock control system can contribute in reducing production and other general costs in all organization

(2) To know how good purchasing practice and technique could aid efficient stock control procedure.

(3) To identify the degree of committement of an organization management team to the adoption of a proper stock control system with a view to reducing the organization operation costs.

(4) To identify some of the factors militating against a through adoption or installation of an effective control system of stock in an organization and after suggestions and recommendation as to how best to approach this issue.

1.4 RESEARCH QUESTION

A lot of questions needs to be asked and answered while carrying out researches in order not to encounter much problems. Some of the questions that needs to be asked and evaluated are therefore as follows.

(i) What is the ideal level of stock control to carry?

(ii) What and from whom shall we order?

(iii) Are the right materials bought at the right time to meet the need?

(iv) Are those in charger of stock control expert in the field?

(v) Is over stocking advisable?

These are some of the question the purchasing manger should answer in order to known how what and when to purchase and not to purchase wrong materials or carrying too little that can be catastrophic for the organization.

1.5 SIGNFICANCE OF THE STUDY

Firstly, this study will be of immense important to the organization or company used as case study because it will be a guide to them towards making certain changes in the required areas hence improving their productivity. In the researchers side it will help him to know more of stock control how to ensure economies in stock control through standard purchase. He is also able to know how to avoid running out of stock which could be dangerous if steady operation could be ensured. The study will also be helped to other students or researchers in acquiring more knowledge and make connection where necessary in the former knowledge they have about the topic “purchasing and stock control”

1.6 SCOPE OF THE STUDY

The research is on contribution of purchasing and stock control in an organization in reducing cost. However, for purpose of this research, ideas are deduced from as many textbooks, journals, review, newspapers and from the researchers experience as possible laying emphasis on concepts, model techniques and theories principle.

1.7 LIMITATION OF THE STUDY

The researcher may encounter a lot of problem in the course of carrying out this study effectively some of the constraints may be the following:- (i) FINANCIAL CONSTRANT: The researcher is a student depending an parents for financial assistance to travel from school to the company or institution under study in order to obtain relevant information needed. (ii) TIME CONSTRAINT: The time lag required to carry out the research work is short, the researcher may find it difficult to combine other academic activities with the research work. (iii) INSUFFICIENT LITTERATURE MATERIAL: The greatest hindrance to this project work is the unavailability of sufficient literature materials, for this work to be effectively carried out by the researcher.  There is also the risk of running up and down to different places in order to get the necessary data for the project as the may not be readily available and cannot be collected once. There is also this transport problem one has to face in the course of carrying out this research work because most of the time, vehicle are not available to and fro the sources of the data collection. The condition under which we are subjected to study is very poor the research has to attend to his lecture at the same time do other assignment and carry out this project work also. However, these do not affect the design of the project, rather the figures and facts counted inside are accurate to the best of my knowledge.

1.8 DEFINITION OF TERMS

(i) PURCHASING: Purchasing is the acquisition or buying of materials and services needed by an organization from an outside source, at right quality, right quantity, right price and right place, which involves the related activities of selecting vendors.

(ii) STOCK: This is a collection of items held in the organization at a particular time for resale stored for use by the organization and process of carrying out its production of goods and services.

(iii) QUALITY: Quality means the ability of bought to serve the intended purpose of functions according to specification.

(iv) STORE: Store is a place where goods are kept for future use.

(v) PLACING OF ORDER: Placing of order in purchasing is the term used by the buyer to tell his suppliers the type of products or items they have to supply to him. It appear in a paper like invoice or receipts.

(vi) PROCUREMENT: Procurement is a purchasing term that is used for buying and selling it is usually seen in the exporting and importing.

(vii) VENDOR: These are the seller of small articles which can be carried around or punch newspaper and magazines is a vendor. But in purchasing he is a supplier in an organization.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

 

 

 

Need a Project Writer for a Different Topic

Full Project – CONTRIBUTIONS OF PURCHASING AND STOCK CONTROL IN COSTS REDUCTION

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!