Full Project – CONTRIBUTION OF STOCK CONTROL IN THE ATTAINMENT OF ORGANISATION OBJECTIVES GOALS

Full Project – CONTRIBUTION OF STOCK CONTROL IN THE ATTAINMENT OF ORGANISATION OBJECTIVES GOALS

Click here to Get this Complete Project Chapter 1-5

CHAPTER ONE

1.0 INTRODUCTION

1.1 BACKGROUND TO STUDY

Stock control is an important area quantity which is of ten neglected and underrated in many organizations both public and private sectors. stock control can be defined as a means by which mathnds of the correct quantity and quantity are made available as and when required by taking due regard to the economy in storage and ordering cost purchasing prices and its working capital. Stock control therefore involves the process of 1) Assessing the items to be held in stock 2) Deciding the extent the holding of such items either individual or collecting 3) Regulating the input of stock into the store houses and 4) Regulating the issues of stock from the store houses. To enable the stock controller to assess the items to be held in the stock, it is necessary that he consider what items that are being used and produced by the particular company, and from this, he can decide which of those items he should stock.

Stock is principally held for the purpose of providing a reservoir of materials to absorb the effort of vanation in both delivery and consumption and also for the maintenance of availability of supplies with the organization concerned. Naturally, it is necessary to held stocks materials which are regularly used ad also those which may be required at short notice in the event of plant. We can define or describe stock control as means by which materials or items of the correct quality and quantity are made available when required with due regards to economy in storage, and cost of ordering purchase price and working capital, stock control can also be describe as the function of planning and maintenance of the right quantity of items for a given production or sales programmed within the minimum of investment.
i) Stock control has the following objectives or items in manner and quantity needed aret the specified time.ii) To reduce the number of items which need to be carried etc, in order to achieve those objectives, the stock control involves to many methods which can be controlled by quantity and by values. it is desirable to control in value. Stocks control in quantity is only bound to give accurate result of every item that is kept at the proper level.

1.2 STATEMENT OF PROBLEM

Certain condition or factor can pace way for effective or ineffective stocking and verification. The problem of this study to get rid of the following

• Lack of proper application of inventory which in indications the physical balance of items in the manufacturing company.

• Lack of proper application of stock level and documentation of items in the company.

• Items are strongly located in the company which exposes the items to deterioration and portage. This constitutes waste which drastically affects the company’s profit maximization. Despite all the importance and benefits of stock taking it has from time to time record some down backs. This study is therefore designed to identify such factors militating against effective and efficient stock control for better performance.

1.3 OBJECTIVES OF STUDY

It is necessary to have look at the past in order to appreciate what we are trying to do in the present so as to do better in the future. Stock control has long time been in existence without the realization by the individual or co-operate goal. subsequently research work has been carried out based on the effective application of the stock control principles techniques and practice in various organization for purpose of achieving a healthy economy in the organization in order to achieve effectiveness and efficiency in an organization of any scope or scale . This research work therefore has the objective of revealing the neglected but important contribution of effective stock in an organization.

The following objectives are to be reviewed:-

• To determine the degree of interference by the employee or any of his sons in the course of carrying out their operations.

• To determine through the Analysis, the degree of effective stock control in manufacturing company.

• That space utilization achieved.

• Examine how optimum safety stock level is determine and maintained.

1.4 SIGNIFICANT OF THE STUDY

The study will be beneficiary to the following persons or group of persons.  The Government: The government will be able to know how resources are being effecting managed and controlled in the public sectors.  The Public Sectors: This study will help the public sector to know the need for proper stock control in an organization.  The stock Manager: This group of persons will be able to identify areas to intending inventory management and control measures.  The Management: They will be in one position to accessing stock control target or goods of the organization are being achieved.  The Researcher: Another significant of this study is that the conditional diploma certificate in Purchasing and Supply with its successful completion, the Researchers will be qualified for the of higher national diploma in Purchasing and Supply which enables the researcher to practice the profession.  Other students: This study will also help other students who want to carryout further research on this topic or related topics.

1.5 RESEARCH QUESTIONS

The research question for this work will be based on the following.

1. What institutes stock regulation in PZ industry

2. Who is responsible for ordering raw material in PZ industry?

3. What determine the quantity of raw material orders?

4. Has PZ industry ever experience excess stock

5. Does PZ industry ever have a case of inadequate stock?

1.6 STATEMENT OF HYPOTHESIS

The following hypothesis is formulated to direct the intent of the study.

1. H0: Holding Large stock of material does not introduce unnecessary ordering cost obsolesce risk and tied of fund in inventories.

H1; Holding Large stock of materials introduce unnecessary ordering cost, obsolesce risk and tied of fund inventories

2. H0: Under stocking of raw materials leads to disruption production and losing sales

H1: Under stocking of raw materials leads to disruption production and losing sales

1.7 SCOPE OF STUDY

This study is designed to give an insight into ways of solving the research problems. The problems of improper application of stock control in PZ industry Nigeria Limited and for the research to study all of them it will be impossible within the time given to the research. Therefore the researcher decided to use PZ Aba as the case study so as carry out an in-depth study of the stock control in that company.

1.8 LIMITATION OF STUDY

The study is limited to an extent in the first place the research was done alongside with my extensive lecture as regard to the researchers preparation for the final examination, being a final year student it became difficult to combine both the research work and other school activities. Other limitation of the study includes: Time, Finance, Non response and Distance. Time: knowing fully well that the researcher is still a student with much academic work load coated with and as this project work has not been given any specific period in the researcher class timetable, the research have constrained to limit his areas of coverage so as to fall within the little time allowed and available

Finance: Taking organization unhealthy economic situation of the country and the world not expect the researcher who is still tied to the nprons strings of his parents to successfully carryout this research which involve huge financial outley. the lack fund affect also the research area as the distance was not track able. Non Response: This was about the greatest limiting factor of the study. the research which was conductor in PZ manufacturing company Aba has relatively few employees adequate information to give which other were not prepared to compromise their job devotion with information required by the researcher. Distance: The area of the researcher is far away from the school and this created a lot of problem to the researcher’s effort. With all these contained, the researcher tried to accomplish their project work successfully.

1.9 DEFINITION OF TERMS

 Stock control: Stock control can be defined as the means by which materials of the correct quantity and quantity are made available as regards to economy in storage and ordering cost, purchasing, prices and the working capital.

 Replenishment: This could be defined as the ability of making something full again by replacing what has been used.

 Deterioration: can be defined as something to be work in quantity or condition

 Inventory: This can be defined as the total number of goods or materials available in a storehouse at a given period of time

 Material control: Material control section of the stock organization that is directly involve with the control of the flow of production material ( in most cases from the supplier production center).

 Interference: Can be defined a get involve in try to influence a situation that does not concern you in a way that annoys other people.

 Stock out cost: There are cost associated with running out of stock. the evidence reason of these costs is the basic reason why stock are hold in the first place or instances these cost includes cost contributions through the lost of sales caused by labour frustration. Over stop pages. extra cost associated with urgent often small quality

 Ordering Cost: It is used in the cases of raw material (supplies) includes the entire cost of in activities such as requisition, purchasing, ordering, transportation, receiving inspection and storing (store placement) ordering cost increase in proportion to the number of order placed.

 Stock: Can be defined as the supplies or commodities necessary for the conduct of the business.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

 

 

 

Need a Project Writer for a Different Topic

Full Project – CONTRIBUTION OF STOCK CONTROL IN THE ATTAINMENT OF ORGANISATION OBJECTIVES GOALS

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!