CHAPTER ONE

INTRODUCTION

1.1    BACKGROUND TO THE STUDY

Production is the transformation of one set of resources into a second set. In order to describe the constraints and opportunities for production, different methods have been developed through the years both in the practical engineering context and from an academic point of view (Grubbström, 1995). For the multi-level, multi-stage production-inventory system, an analysis applying the combined methodology of input-output analysis and the place transform has proven to be useful. In practice, the managerial information system dealing with multi-level, multi-stage production-inventory systems is referred to as Material Requirements Planning (MRP). Here, product complexity as well as lead times are essential ingredients. In this research we allow these terms to be used in a synonymous way both for the theoretical analysis and as a name for the corresponding practical information system. In a multi-level manufacturing system finished products, subassemblies, components, raw materials, etc., (items), are distinguished. MRP reduces a master production schedule of finished products into a time-phased suggested schedule of requirements of intermediate items to be manufactured and purchased, based on the estimated external demand for finished products. This “parts explosion” determining requirements from higher levels down to lower levels (upstream to downstream) traces the product structures. Material Requirements Planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for dependent demand items. Dependent demand items are components of finished goods—such as raw materials, component parts, and sub assemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactures bicycles; dependent demand inventory items might include aluminium, tires, seats, and derailleurs.

The first MRP systems of inventory management evolved in the 1940s and 1950s. They used mainframe computers to explode information from a bill of materials for a certain finished product into a production and purchasing plan for components. Before long, MRP was expanded to include information feedback loops so that production personnel could change and update the inputs into the system as needed. The next generation of MRP, known as manufacturing resources planning or MRP II, also incorporated marketing, finance, accounting, engineering, and human resources aspects into the planning process. A related concept that expands on MRP is enterprise resources planning (ERP), which uses computer technology to link the various functional areas across an entire business enterprise. MRP works backward from a production plan for finished goods to develop requirements for components and raw materials. “MRP begins with a schedule for finished goods that is converted into a schedule of requirements for the subassemblies, component parts, and raw materials needed to produce the finished items in the specified time frame,” William J. Stevenson wrote in his book Production/Operations Management.

MRP breaks down inventory requirements into planning periods so that production can be completed in a timely manner while inventory levels—and related carrying costs—are kept to a minimum. Theoretically, it is often asserted that, when implemented and used properly, MRP can help production manager’s plan for capacity needs and allocate production time. However, it is also argued that MRP systems can be time consuming and costly to implement, which may put them out of range for some small businesses. In addition, the information that comes out of an MRP system is only as good as the information that goes into it. Thus, for MRP to be successfully implemented and sustained, current accurate bills of materials, part numbers, and inventory records must be maintained. These and similar, issues relating to the concept and practice of MRP is what this research work intends to examine.

1.2   STATEMENT OF THE PROBLEMS

As stated earlier, MRP is a planning technique designed to assist production manager in scheduling and placing orders for dependent demand items such as raw materials, component parts and sub-assemblies relative to the desired level of production. However, it has been observed that the technique is not yet very popular among organization. Not only that, it is also argued that the system is so time consuming and costly that not every organization can adopt it.  In this research work, attempts have been made to critically assess the possible contribution of the MRP technique to the efficiency of manufacturing organization with particular focus on production cost.

1.3   OBJECTIVES OF THE STUDY

The objective of this study is to examine Material Requirement Planning as it ensures availability of material in an organization. The specific objectives are:

1. To highlight the usefulness of MRP in PAN.

2. To identify the various materials related operational problems in PAN that can be handled by the application of the MRP technique.

3. To provide knowledge for future research work.

1.4   STATEMENT OF HYPOTHESIS

The study shall be guided by this hypothesis, thus;

H0: Material Requirement Planning is not a strategy for cost reduction in manufacturing organization

H1: Material Requirement Planning is a strategy for cost reduction in manufacturing organization

1.5   SIGNIFICANCE OF THE STUDY

The significance of this research work cannot be over emphasized because it is a requisite for the award of higher National Diploma in Production and Operations Management. The study will help manufacturing organizations to appreciate and understand MRP as it affects productivity and reveal ways in which it could be applied for desired benefits. Students in business and management studies can also expand their knowledge base from this research work. It can also be used as a reference material and a base for further research. To the government, the study will introduce an efficient system of production planning to replace the traditional, inefficient practices found in public corporations.

1.6   SCOPE OF THE STUDY

This research work covers the Material Requirement Planning (MRP) as a cost reduction strategy in a manufacturing concern. It however, limits it scope to PAN Kaduna.

1.7   LIMITATIONS OF THE STUDY

1) Finance: with the present doomed financial situation the researcher finds it difficult to purchase necessary materials for the project at reasonable cost and also to carryout other relevant facts find exercise with ease.

2) Time constraint: It is very important for one to get enough time to accurate and up to date, but the time available for this work is not adequate as a student, the researcher has to face the project, at the same time coupling with the class work, preparation for final examination as well as numerous assignments.

3) Another problem is the acute shortage of qualified, skilled and experienced personnel to effectively provide the researcher with appropriate data in course carrying out the research.

1.8   HISTORICAL BACKGROUND OF PAN

The entry of most popular and favourite vehicle Peugeot brand into Nigeria dates back to 1957 when the first set of 100 units of Peugeot 403 car were imported by individual into the country. Within a period of two years Peugeot 403 became so popular as a result of its dependability, suitability in Nigeria roads that assumed the status of official cars for many top government officials and wealthy business people. This unprecedented achievement led to the appointment of SCOA in 1957 as the sole agent for Peugeot cars in Nigeria and imported the first set of 403 Peugeot cars. Since independence in 1960, the growth rate of Nigerian economy had taken such a proportion that the number of imported cars could no longer cope with the demand, the military government of Nigerians opened negotiation with automobiles Peugeot of France for the setting up of an assembly plant in the country. That dream became reality when on December 15th 1972 Peugeot Automobiles of Nigeria was incorporated with an authorized share capital of N3, million and paid up capital of N2, million on 14th march, 1975 the assembly plant in Kaduna was commissioned by general Yakubu Gowon, the Head of state. That same year the first set of Nigeria Peugeot cars rolled out of the plant. However, with time a further rise in demand for production at the plant in the country necessitated the federal government introduction of the structured adjustment programme (SAP). Since its inception, PAN has turned out over N370, 000 cars with total assets amounting to N1, Billion at the end of 1990.

OBJECTIVE OF PAN

The Peugeot automobile of Nigeria was established in 1975 with the following objective

To Chart a course for Nigerians industrialization in the area of assembly and manufacturing of automobiles vehicles

To engage in a local assembly or production of cars suitable to Nigerians physical environment and chaotic condition.

To produce vehicle spare parts and accessories

To reduce dependence on importing the automobile industry and therefore help conserve foreign exchange for the country.

To serve as an avenue for the transfer of technology by providing on the job training to Nigeria workers techniques and managers who would eventually develop technology usable in many aspect of the economic life of the country

To create employment opportunities for the growing arms of skills, semi skilled and unskilled Nigerians by developing on industrial network of supplies that would contribute to the establishment of basic technology in the field of machinery stamping manufacturing of plastic parts etc.

ORGANIZATION STRUCTURE

To function effectively, every business organizations need a structure which has the characteristics of unity, continuity, flexibility and predictability required for efficient interactions with its environment. The problem of planning and monitoring when management must overcome to be successful is to ensure that the objective of each part of the organization are securely welded together (unity) using both start and long term forecasting (continuity) being able to adopt the plan in the light of changing circumstances (flexibility) and attempting to accurately predict course of action (predicting) to meet the increasing challenges of its responsibility and expectation of its performance. At the apex of the pyramidal chart is a board of directors headed by a chairman appointed by the federal government. The board of directors is the highest hierarchy. The board responsibility is that of formulating policy guideline for implementation by the general management teams. They plan, organize, set goals and formulate policies. The collective policies and decisions of the board are carried out by the chairman. The general management team is headed by a managing director (a foreigner) assisted by a deputy director (a Nigeria). Directly attached to the office are company’s secretary department and three functional department namely, internal audit, corporate planning and data processing. There are four general managers who run the affairs of the company’s (4) major division. These divisions are personal, administration, commercial, finance and finally industrial.

1.9    DEFINITION OF TERMS

Quality: – this is the ability of a product to meet with customer expectation.

Materials: – these are components, parts, raw materials that are used to produce other goods that are kept in the storehouse.

Specification: – this is the detail description of requirement laid down for material component or process or service.

Quality control: – is the process of setting standard for acceptability of goods purchase or goods manufacture where actual is compare with expected quality.

Standard: – It is the level used as a measure for weight, length, quality, tests or for the required degree of excellence.

Inspection: – is the logic checking of conformance with specification or standard.

Monitoring: – Is the process of continuous inspection to see that tests are been carried out in accordance with specification. Cost: monetary value of goods or service purchase.

Product: bundle of an item(s) that provide satisfaction, manufacturing output or performed services.

Reliability: – products or service that have all the characteristics expected of them in terms of functional performance, taste etc.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

Full Project – THE IMPACT OF MATERIAL REQUIREMENT PLANNING IN MANUFACTURING INDUSTRY

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!