Full Project-THE EFFECT OF FLUCTUATING FOREIGN EXCHANGE RATE ON NIGERIA CURRENCY

Full Project-THE EFFECT OF FLUCTUATING FOREIGN EXCHANGE RATE ON NIGERIA CURRENCY

Click here to Get this Complete Project Chapter 1-5

THE EFFECT OF FLUCTUATING FOREIGN EXCHANGE RATE ON NIGERIA CURRENCY

 

CHAPTER ONE

INTRODUCTION

1.1  BACKGROUND OF THE STUDY

The inter-bank market in foreign exchange is used for trading in foreign currencies – main vehicle for generating autonomous inflow of foreign exchange into the banking system.  La licensed banks, development banks and the central bank are active traders the market. These banks intermediate for their corporate and individual customers that engage in international trade and investment. They are always prepared to buy or sell foreign currencies to their customers in both the spot and forward markets.  In addition, authorized dealers open and maintain foreign currency domiciliary accounts for their customers, especially the exporting customers.

Exchange rates ruling in the inter-bank market fluctuate in response to the forces of supply and demand for foreign currencies, subject to a maximum spread of one percent between the buying and selling rates.  Al the authorized dealer banks are required by CBN to display their buying and selling rates for spot transactions, but are allowed to negotiate with customers in respect of forward transactions within the one per cent allowable spread or margin.  Authorized dealers are expected to make delivery of transactions of foreign currency to customers within three days from the day payment is made. The overall supervision of the market falls to the Central Bank of Nigeria which may, with the approval of the minister of Finance, intervene in the market from time to time to prescribe guidelines and give new directives.  The Central Bank of Nigeria intervenes at a biding session in order to minimize any large fluctuations in the niara exchange rates. For example, in 1986, the Central Bank of Nigeria intervened at the 6th session and at the 12th session.

In practice, the usual sources of foreign exchange to the market include the Central Bank of Nigeria auction, inflow to banks through autonomous sources, non-oil exports via dormiciliary foreign currency accounts, invisible trade items and other miscellaneous sources. For example in December 1986, the value of foreign exchange flowing in form these sources were: CBN auction $237.99 million, banks $28.99 and other miscellaneous sources $48.98million.  It is interesting to note that the introduction of the Second-tier Foreign Exchange Market (SFEM) in September 1986, coupled with the dismantling of exchange controls have increased the inflow of foreign exchange from autonomous sources.  For exchange, the inflow of foreign exchange from private sources between October 1986 and May 1987 was put at $706 million (or about N2.6 billion).

1.2  STATEMENT OF THE PROBLEM

Apart from the purely technical question of ensuring the steady appreciation of naira, one of the primary functions of determinants of exchange rate (CBN) is to sustain the value of the naira during fluctuation. There are, however, other major problems falling our currency and it’s management.  The persistent geometric progression in depreciation and arithmetic progression in appreciation of naira have discouraged foreign investors due to they cannot make it.  There appears to be no evidence more convincing about the need to central foreign exchange rate fluctuation, than the ever public outcry at the rate our money in falling and rising at the foreign market. Many citizens going out of the country and public debts increasing. Of utmost concern is the fact that as years roll by, the problem of the economy appears to be insurmountable. The problem of creating awareness to dealers on the impact of exchange rate fluctuation on their investment profits that the profit seeks to address. The general publics have little knowledge of financial implications associated with the unsteady exchange rate. Furthermore, there is the problem of dealers and citizen, not being aware of the impact or effect of the fluctuation of foreign exchange rate on naira’s value. Finally, the problem of knowing how possible it is for the determinants (both CBN and others) to control the issue to a considerable rate after the exercise.

1.2    SIGNIFICANCE OF THE STUDY

There have been a lot of thought about the N.70: N138, appreciation and depreciation respectively to $1.00, in the foreign exchange market.  The research wants to carryout a research on what the government through the exchange rate determinants were doing and find out if the adept any exchange control measure in the currency management.  The researcher also wants to have an empirical base either to support all the poor impression people have o the naira exchange rate with dollar and to advice on how to improve the value by adopting exchange rate control measures.         Therefore, the need for the study includes:
–      To brought to light the effects of the fluctuation of foreign exchange rate on naira.
–      To advice the nation on the necessity to check it.
1.3  PURPOSE OF STUDY
From all that has been written above, it is the aim of this study to take a segment of the Central Bank of Nigeria, and study the approach of the bank towards the exchange rate fluctuation.
–      Whether or not the CBN apply exchange controls as a bases for putting it to a considerable rate.
–      If the measures introduced had done any thing over it and
–      To formulate strategies and make recommendations that would be more effective in the foreign management.
1.4  SCOPE AND LIMITATION OF THE STUDY
The scope of the study is very wide if it has to be carried out in all the branches of CBN, including the headquarter. The study is limited, based on the facts that there is no time and material resources to see tot he whole systems. This study is limited to (Enugu State) and the findings may not reflect the situation in the whole country. These findings may not be valid for the whole branches of CBN, but by and large, what happens in Enugu branch can be said to apply to other breaches.
1.5  RESEARCH PROPORTION
It is the objective of this study to know if:
1.    The determinants of exchange rate mounts mish pressure on its fluctuation effects on naira.
2.    CBN apply the foreign exchange rate control measures, it put the fluctuation to a considerable rate.
3.    People have said reasonable things concerning it.
4.    What had been done before yield any good results.
1.6    DEFINITION OF TERMS 
The following terms used in this study should be taken to mean following.
1.6.1     FOREIGN EXCHANGE MARKET:  This is an arrangement which exists to assist buyers and  sellers of foreign exchange to enter into contract of buying and selling.
1.6.2     FOREIGN EXCHANGE:  This is a means of international payments. It includes currencies of other countries that are freely acceptable in effecting international transactions.
1.6.3    EXCHANGE RATE:  This is the price of one currency in terms of other.
1.6.4    TRADE WEIGHTED EXCHANGE RATE: This is the value of a domestic currency expressed in terms of a weighted basket of currencies of the major trading partners.  The weighted assigned to each currency reflects the volume of trade with the country of domicile.  The weights are reviewed regularly to take accounts of changing patterns of trade.
1.6.5    DUTCH AUCTION SYSTEM (DAS):  This is a method of exchange rate determination through auction where the bidders pay according to their bid rates.  The ruling rate is arrived at with the last bid rate that clears the market.
1.6.6    DUAL EXCHANGE RATES REGIME:  This situation exists when two exchange rates are in existence in an economy.  This was the situation in Nigeria between September 1986 and July 1987 when two rates, the first and second-tier rates were in place.  Again in January 1995, a dual exchange rate system made up of the pegged, official exchange rate and floating, autonomous exchange rate, was introduced.
1.6.7    AVERAGE PRICING METHOD:  This is a method of exchange rate determination where the average of bid rates is applied as the ruling exchange rate.
1.6.8    MARGINAL PRICING METHOD: This is the method in which bid rates are arranged in a descending order of magnitude and the rate at which available foreign exchange is exhausted is the marginal rate.
1.6.9    MODAL AVERAGE METHOD:  This is the method of determining the exchange rate by averaging the rates tending towards the mode.
1.6.10  ELIGIBLE TRANSACTIONS:  The authorized dealers in foreign exchange which comprise all licensed banks, that is to say, commercial and merchant banks and belatedly development banks and bureau de change.

1.6.11 CURRENCY CONVERTIBILITY:  Simply, convertibility may be defined as the ability to exchange one country’s currency for another’s, without any hindrance or restriction from the monetary authorities of either country.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

1, Accounting Research Project

  1. Adult Education
  2. Agricultural Science
  3. Banking & Finance
  4. Biblical Theology & CRS
  5. Biblical Theology and CRS
  6. Biology Education
  7. Business Administration
  8. Computer Engineering Project
  9. Computer Science 2
  10. Criminology Research Project
  11. Early Childhood Education
  12. Economic Education
  13. Education Research Project
  14. Educational Administration and Planning Research Project
  15. English
  16. English Education
  17. Entrepreneurship
  18. Environmental Sciences Research Project
  19. Guidance and Counselling Research Project
  20. History Education
  21. Human Kinetics and Health Education
  22. Management
  23. Maritime and Transportation
  24. Marketing
  25. Marketing Research Project 2
  26. Mass Communication
  27. Mathematics Education
  28. Medical Biochemistry Project
  29. Organizational Behaviour
  30. Other Projects
  31. Political Science
  32. Psychology
  33. Public Administration
  34. Public Health Research Project
  35. More Research Project
  36. Transportation Management
  37. Nursing

 

 

Need a Project Writer for a Different Topic

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!