Full Project – Safety compliance for high rise projects in Nigerian construction industry

Full Project – Safety compliance for high rise projects in Nigerian construction industry

Click here to Get this Complete Project Chapter 1-5

CHAPTER ONE

INTRODUCTION

1.1          Introduction

Generally, this research is focused on safety compliance for high rise construction projects. Besides that, this study is also intended to recommend appropriate ways to improve the compliance of safety practice. Basically, this chapter covers the background, problems statement, aims and objectives, and scope of the study. The research methodology involved in conducting this study is also briefly explained.

1.2         Background of the Research

Construction industry in developing countries has performed far below the expectation in the areas of health and safety, the situation in Nigeria is no exception. This is due to the fact that, there is no existing functional legislation with regards to occupational health and safety in Nigeria Isaac et al., (2014). Occupation safety and health (OSH) in Nigeria is traced back from the slave trade period in Nigeria. According to Kalejaiye (2013), records show that the medical examination board of the Liverpool infantry introduced occupational health and safety in Nigeria in 1789.

A current trend in modern cities all over the world is the development of high-rise buildings mainly to overcome the challenges of urban over population, for optimal use of scarce land resources, as status symbol, as tourist attractions and for beautiful skylines (Ede, 2014). Regardless of these advantages, the development of high-rise buildings in Nigeria has been experiencing drawbacks. The retarding growth translates to the very fewness of high-rise buildings in existence in Nigerian cities just as even most of the few in existence are poorly utilized due to some persistent factors. With the continuous increase in the population of Nigeria (which have moved from 140 million in 2006 to 170 million in 2014), leading to ever increasing surge in rural – urban drift, land scarcity and the consequent high cost of available land can only be expected to be on the increase especially in Abuja. Bearing in mind that tall, thin buildings have smaller footprints than the equivalent number of low-rise housing units, making them occupy less land area; it is a wonder that building high is not growing at some significant rate compared to the galloping growth of Nigerian population. The low rate of building tall will heighten the burdensome challenge of housing in Nigerian urban cities Ede, (2014).

However, in 1981 Nigeria signed the Geneva Convention on OSH (Adeogun Okafor, 2013), yet 32 years after, implementation of proceedings of the convention the nation has suffered setbacks making it at insignificant level of achievement towards the OSH implementation. Adeogun & Okafor (2013) based on their studies also found that, the implementation and adoption of occupation safety and health (OSH) in Nigeria is still at preliminary stages. Similarly, Diugwu (2012) Okolie (2012) states that occupational safety and health (OSH) in Nigeria has received little attention from the government. The ill-fated occupation safety and health (OSH) regulatory system in the country does not encourage mandatory reporting of accidents. However, Diugwu et al. (2012) blame the big gap in occupational safety and health (OSH) in Nigeria on the dysfunctional health and safety laws in the country. As a result, all the sectors in the country are clearly unregulated in relation to OSH (Diugwu et al., 2012).

The protection of safety and welfare of people in the workplace that may be indirectly affected by the activities in the workplace- occupational safety and health (OSH) should be contingent on healthy legal instruments which require optimum compliance (Akpan, 2013). On a Sad note, Idubor (2013) argue that compliance with occupational safety and health (OSH) regulations cannot be isolated in the improvement of Nigerian construction industry. Nigerian Federal Ministry of Labour and Productivity Inspectorate Division (FMLPID) – is the body empowered by the Factories Act F1 LFN 2004 to enforce occupational safety and health (OSH) in Nigeria (Umeokafor et al., 2014). Hence, it is quite evident in the literature that enforcement and lack of compliance to OSH in Nigeria cannot be overemphasizing, as it has resulted in numerous casualties and accidents on site in the Nigerian construction industry. Falls from high elevation has been identified in the literature as the most frequent type of accident that occur. However, it is also evident that most of these accidents occur due to either lack of compliance to OSH and enforcement or both. Therefore, in this research occupational safety and health will be the main theoretical cornerstone in exploring the level of compliance to OSH in Nigerian construction industry.

 

1.3         Problem Statement

High rise structure, faced with several problems and experience accidents that endanger the lives of its occupants, destroy facilities and equipment within them, and affect other neighbouring structures Ede, (2014). The most feared hazards of tall buildings around the world are fire, terroristic attaches and building collapse.

According to Mohamed (1999), accidents on construction sites, causes many human tragedies, de-motivate workers, disrupt site activities, delay project progress, and adversely affect the overall cost, productivity and reputation of the construction industry. In recognition of the problems above, countries all over the world have seen the necessity of improving occupational health and safety management on construction sites, particularly to reduce the number of accidents on construction sites.

Occupational safety and health has been a major sort of concern for employees, employers and government for the past decades globally, effort to reduce the number of occupational injuries, and fatalities the Nigerian government opted to regulate the construction industry Olutuase et al, (2014). The Nigerian construction industry has recorded a disproportionate number of fatalities and disabling injuries as shown in Table 1indicates the rates of fall and injuries in Nigerian construction projects for the past decades. Falls from elevation and injuries are among the most costly and damaging categories of accident that occur. Based on the injury and fatality rate report from the Nigerian Federal Ministry of Labor and Productivity.

Table 1: Death, fatality rate and number of accident reported to Nigerian federal ministry of labour and productivity (FMLPID; 2002 -2012).

YEARS NO OF % OF NO  OF % OF NO OF % OF CASE OF
  INJURIES INJURIES DEATH DEATHS ACCIDENTS ACCIDENTS FATALITY
              REPORTED REPORTED RATE
                       
2002 50 53.8   29 63   1   2.5   58
                       
2003 1 1.1   1 2.2   1   2.2   100
2004     1   2.2  
2007 4 4.3   1 2.2   3   7.5   25
2008 8 8.6   6 13   2   5   75
2009 3 3.2   2 4.3   16   40   66.7
2010 5 5.4   1 2.2   3   7.5   20
2011 8 8.6   2 4.3   7   17.5   25
2012 14 15.1   4 8.7   6   15   28.6
TOTAL 93 100   46 100   40   100   49.5

 

Accidents and fatalities rate at construction industries is still high in Nigeria based on the recorded fatality rate of workers from 2002 to 2012 which is very far behind compared to developed countries like Japan, France and the United States of America USA with the rate of below 20 per 100,000 workers (NIOSH, 2010; Kortum, 2011).

The regulations of occupational safety and health OSH in Nigeria has received little attention, with little emphasize to strict adherence to safety in the construction industry and very minimal impact made by the inspection officers towards ensuring strict compliance. The accidents records above indicate an alarming rate of injuries and fatalities on sites (Diugwu et al., 2012). Hence, there is need to find a way of minimizing the rate of falls and injuries in Nigerian construction industry. Thus, this research seeks to investigate the level of compliance to occupational safety and health (OSH) in Nigerian construction industry.

 

 

1.4         Research Questions

  1. What is the current level of compliance to safety regulations and policies in high rise construction projects of Nigerian construction industry?
  2. What are the factors that prevent compliance to safety practices in high rise construction projects of Nigerian construction industry?
  3. What is the appropriate ways to improve the compliance to safety practices in high rise construction project of Nigerian construction industry?

1.5         Objectives of Research

The aim of this research is to investigate the level of compliance to safety in high rise construction project with special focus on safety at construction process in Nigeria. In achieving this aim three (3) objectives has been outlined;

  1. To investigate the current level of compliance to safety regulations and policies in high rise construction projects of Nigerian construction industry.
  2. To investigate the factors that prevents the compliance to safety practices in high rise project of Nigerian construction industry.
  3. To recommend appropriate ways to improve the compliance to safety practices in high rise construction of Nigerian construction industry.

1.6         Significance of Research

This research will be of great significance to the tradesmen that are highly expose to hazard in carrying out their respective duties, as vast majority of tradesmen are ignorant of the safety compliance level. This research will however, alert the relevant authorities in ensuring occupational safety and health compliance in Nigerian construction industry. Hence, minimize the rate of accidents as a result of lack of compliance to occupational safety and health in the industry.

 

This research will also be of great significance to academia and practitioners in the field of construction management by exploring inadequacies and inefficiencies in occupational and health safety compliance in the Nigerian context. In addition, exploring the potentials for more studies to be conducted towards formulating comprehensive frameworks for ensuring safety compliance most especially in high rise building construction.

 

1.7  Scope of Research

The research will focus on the safety compliance for high rise construction project at construction stage, in the central district area of Abuja the capital city of Nigerian. Abuja as the capital city of Nigeria has various construction development taking place to achieve the target master plan of the great city The capital city will be selected due to the high number of construction activities going on, which are predominantly high-rise projects associated with both industrialized and conventional concept of construction Iwuagwu (2011).

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for international clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour

32    Other Projects pdf doc

  1. Political Science
  2. Psychology
  3. Public Administration
  4. Public Health Research Project
  5. More Research Project
  6. Transportation Management
  7. Nursing

Education

 

See Other Essay Here

 

 

Full Project – Safety compliance for high rise projects in Nigerian construction industry

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!