Full Project – ENVIRONMENTAL IMPACT ASSESSMENT OF A PROPOSED TANKFARM

Full Project – ENVIRONMENTAL IMPACT ASSESSMENT OF A PROPOSED TANKFARM

Click here to Get this Complete Project Chapter 1-5

ABSTRACT

This study was carried out to assess environmental impacts of a proposed tankfarm which is to be situated at the Olokola Free Trade Zone in Ondo State (OKFTZ).

It encompasses various field sampling which includes soil, air and noise sampling taken from the proposed site. These samples were tested in the laboratory for parameters such as Total Hydro Carbon, pH values, Total Mean Percentage of Organic Matter, Heavy Metal Investigation, cation concentration. The Total Hydro Carbon which ranges from 4.8 to 33.0 milligram per kilogram

(mg/kg) in the wet season and 4.0 to 78.5 mg/kg for dry season. The THC is reflective of an unpolluted environment, and it is widely accepted that soils with a hydrocarbon level below 100 mg/kg are considered unpolluted. Heavy metals investigation showed that Iron had the highest mean concentration (2213mg/kg) followed by Zinc (4.82mg/kg) and Copper (3.78mg/kg) for dry season while for wet season, Iron had 2039mg/kg followed by Zinc (8.68mg/kg) and copper (3.0mg/kg). The concentration of the monovalent cation in the soils was generally high. Sodium (Na) concentrations ranged between 2,136 and 7,341mg/kg

in the wet season and 6,175 and 10,308 mg/kg in the dry season while potassium (K) ranged between 0.09 and 0.15 mg/kg in the wet season and 0.04 and 0.45mg/kg in the dry season. The high sodium content could be attributed to the proximity

of the study area to the ocean.

Suspended Particulate Matter Levels for Wet and Dry Season on shows that there are more suspended particulate matter in the dry season as the result indicated a value of 196 µg/m3 against 64µg/m3 in the wet season. Comparing these findings with EGASPIN guidelines for national air quality standards, more air quality monitoring is needed during the dry season as it reaches a high of 196 though it is still within the EGASPIN (Environmental Guidelines and Standards for Petroleum Industries in Nigeria)  limits. Noise measurements showed that the measured levels varied significantly in the different locations

monitored and ranged from a low of 55.2dB to a high of 66.7dB, for the dry season and 52.7dB to a high of 67.9dB, for the wet season as compared to the World Bank standard of 45 dB(A) for residential areas during the daytime. It is recommended that environmental performance be monitored regularly to ensure compliance and those measures to be taken where necessary. The OKFTZ site is generally suitable for the proposed bulk fuel storage facility and all environmental risks can be minimized and managed through implementing preventative measures and sound environmental management systems.

TABLE OF CONTENTS

Title page

Certification

Dedication

Acknowledgement

Abstract

Table of Content

List of Tables

List of Figures

CHAPTER ONE: INTRODUCTION

1.1 Introduction

1.2 Objectives of the Project

1.3 Scope of the Project

1.4 Justification of the Project

1.5 Expected Contribution to Knowledge

1.6 About OKFTZ (Olokola Free Trade Zone)

CHAPTER TWO:   LITERATURE REVIEW

2.1 Environmental Impact Assessment and the Environments

2.2 General Overview of the EIA Process

2.3 Steps Involved in EIA

2.3.1 Screening

2.3.2 Scoping

2.3.3 Impact Assessment

2.3.4 Mitigation

2.3.5 Reporting

2.3.6 Reviewing

2.3.7 Decision Making

2.3.8 Implementation

2.4 Importance of Environmental Impact Assessment

2.5 General Benefits of EIA and flaws

2.6 Environmental Policy

2.7 Nigeria Guidelines and Standards

2.8.1 National Effluent Limitation Regulation

2.8.2 Department of Petroleum Resources

2.8.3 Nigeria Petroleum Industry Guidelines

2.9 Effluent Standards

2.10  Ambient Air Quality

2.11  Noise Level

2.12.1  Potential Environmental Impact Analysis

2.12.2  Impact Qualification

2.12.3  Impact Rating

2.12.3.1 Legal/regulatory Requirement (L)

2.12.3.2  Risk (R)

2.12.3.3  Frequency of Impact (F)

2.12.3.4  Importance of Affected Environment Component and Impact (I)

2.12.3.5  Public Perception (P)

CHAPTER THREE

Materials And Methods

3.1  Description Of The Study Area

3.1.1 Geology Of The Study Area

3.1.2  Local Climate And Meteorology

3.2 Samples Collected

3.3 Equipments

3.4 Sample Preparation

3.4.1 Soil

3.5 Methods

3.5.1  Determination Of Ph

3.5.2  Determination Of Exchangeable Cations

3.5.3  Temperature

3.5.4  Determination Alkalinity

3.5.5  Chloride Determination

3.5.6  Determination Of Heavy Metals

3.5.7 Determination Of Air Quality And Noise

3.6 Assessment Methodology

3.6.1 Impact Quantification

3.6.2 Impact Rating

CHAPTER FOUR

Results And Discussions

4.1 Physiochemical Characteristics Of Soil

4.1.1 Analysis Of Selected Physiochemical Charateristics Of Soil

4.1.2 Analysis Of Selected Heavy Metal Observations

4.2 Soil Texture Data

4.2.1  Analysis Of Soil Texture

4.3 Analysis Of Air Quality And Noise Data

4.3.1 Analysis On Air Quality

4.3.2 Analysis Of Noise Level

4.4 Potential Impacts For The Proposed Tankfarm Facility

4.4.1  Impacts On Air Quality

4.4.2 Impacts On Noise Level

4.4.3 Impacts On Soil Quality

4.5 Mitigation And Management Measures

4.5.1 Air Quality

4.5.2 Noise

4.5.3 Soil Quality

CHAPTER FIVE

Conclusions And Recommendations

5.1 Conclusions

5.2 Recommendations

References

INTRODUCTION

Environmental Impacts Assessment is an assessment or the analysis of the possible positive or negative impact that a proposed project may have on the environment together consisting of the environmental, social and economic aspects (International Association of Impact Assessment, 2002). Environment Impact Assessment or EIA can also be defined as the study of predicting the effect of a proposed activity/project on the environment. A decision making tool, EIA compares various alternatives for a project and seeks to identify the one which represents the best combination of economic and environmental costs and benefits. EIA systematically examines both beneficial and adverse consequences of the project and ensures that these effects are taken into account during project design. It helps to identify possible environmental effects of the proposed project, proposes measures to mitigate adverse effects and predicts whether there will be significant adverse environmental effects, even after the mitigation is implemented (IAIA , 2002). By considering the environmental effects of the project and their mitigation early in the project planning cycle, environmental assessment has many benefits, such as protection of environment, optimum utilization of resources and saving of time and cost of the project (Wikipedia, 2013).

Environment refers to the totality of natural resources including the intricate interrelations among living and non living things which constitute the ecosystem and biomes (Randall et al; 1987). Webster’s new collegiate dictionary (2012) defined environment as the aggregate of all the external conditions and influences affecting life and development of organisms. Sada and Odemerho (2001) conceive environments as a system within which living organisms interact with the physical elements. Environment is a common property not only of existing stakeholders but also of the future generations (Okonkwo, 2004)

A Tankfarm is also known as an oil depot or oil terminal, a facility for storage of petroleum products or petrochemical products from which these products are usually transported to end users for further storage facilities. An oil tankfarm typically has tanks or either above or under the ground and gantries for the discharge of products into road tankers or other vehicles such as barges or pipelines. Tankfarms are usually situated close to oil refineries or locations where marine tankers or vessels containing products discharge their cargo.

A Tankfarm is a comparatively unsophisticated facility in that (in most cases) there is no processing or other transformation on site. The products which reach the depot from refinery are in their final form suitable for delivery to customers. Modern Tankfarms comprise the same types of tanks, pipelines and gantries as those in the past and although there is a greater degree of automation in site, there have been significant changes in depot operational activities over time (Wikipedia 2013).

One of the key imperatives of Health, Safety and Environment (HSE) is that the operators of a Tankfarm must ensure that products are safely stored and handled. There must be no leakages which could damage the soil or the table water and these forms of undesirable activities gives rise to the analysis of some predictable and unpredictable impacts of Tankfarm to the existing environments and thus brought about the delivery of this project.

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

 

 

 

Need a Project Writer for a Different Topic

 

Full Project – ENVIRONMENTAL IMPACT ASSESSMENT OF A PROPOSED TANKFARM

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!