Full Project – ASSESSMENT FOR CONTROLLING OF DAMPNESS IN AN EXISTING BUILDING IN NIGERIA

Full Project – ASSESSMENT FOR CONTROLLING OF DAMPNESS IN AN EXISTING BUILDING IN NIGERIA

Click here to Get this Complete Project Chapter 1-5

ABSTRACT

This study investigated the assessment for controlling of dampness in an existing building in Nigeria. The study came as a result of the prevalent issues in the number of cases of building collapse in Nigeria especially in Lagos State. The descriptive research design was adopted for carrying out this study. Data were collected and analysed with the use of SPSS. The study had the following as the research objectives: to identify the prevalence of dampness in an existing building in Nigeria, to survey the effects of dampness in an existing building in Nigeria and to inquire the reasons for dampness in an existing building in Nigeria.

CHAPTER ONE

INTRODUCTION

1.1   Background to the Study

A building delivered to the satisfaction of the client is one that is accepted as being of high standard and built using good machineries. This is bound on the premises of estimated cost. Recently, the Nigerian construction industry is currently witnessing a number of high-profile building collapses especially in Lagos State. During this year, the property and environment column of the Vanguard Newspaper emphasized the prevalent of collapsed building in all the nooks and crannies of the country, with Osun State inclusive. Building collapse is an occurrence that is beyond technological and scientific explanation. There can be no failure of a building without a prior failure of some building components. The technology of construction can never guarantee complete elimination of some degree of failure because of the fact that structures settle down, however slightly, on completion, as a result of consolidation of subsoil imposed by the weight of the structure.

Depending on the magnitude of this movement, failure can develop. Professional bodies tend not to accept the responsibility for the incidence of building collapses as a result of component failure in Nigeria but rather put the heavy blame on the occupants. Rather, each of the bodies that represent town planners, quantity surveyors, engineers, architects, builders and building organisation will often seek to attribute blame outside the profession. The loss of materials and money cost of remedial measure, infliction of permanent injury, loss of life and so on, which result from building component failure, are both monetarily and psychologically significant. The rate of failure of building components in Nigeria is a cause for concern and as such demands urgent attention. Precautionary measure will start once designers take a total measure of their designs and become sensitive to the financial and psychological implication of any failure of the building components both during and after completion.

Some numbers of Nigerian structures are often inadequately maintained and even badly situated in term of location and windows, doors and other building elements and facilities frequently show evidence of lack of maintenance and repair. Certain residential and office buildings in Lagos, Nigeria have not seen right significant maintenance or show little signs of maintenance since they were constructed, some years back. This is evident as there many cases of building collapse in the state. This lack of maintenance by authorities and occupants of these structures often leads to reduced lifespan of these buildings as stated by Melvin (1992), which invariably defeat the purpose for which they are put i.e. to ensure that the nation’s stock of buildings, both as a factor of production and accommodation, was used effectively as possible.

Studies have revealed the effects of countless factors affecting maintenance and defects of buildings. Adejimi (2005) revealed twelve factors affecting the maintenance strength of building as design resolution, structural strength, specified materials strength, maintenance manual, safety measures, skill maintenance personnel, maintenance plants and  environmental factors. While Olagunju (2012) identified factors that influence the level of maintenance of public building standard. In the study eight factors were identified to be significant to physical condition of public building. The variables include architectural components condition, interior and exterior factors like; electrical wiring, toilet facilities, roofing, discharge of waste water component condition of walkways within the building surroundings. To evaluate the factors affecting building defects, Addleson (1977) concluded that natural factors can be summarized into three group of dampness, movement and chemical and biological change. Lack of adequate care and fallibility of people that initiate, design, construct and maintain buildings, accentuated by their educational, practice and commercial environment are the ultimate factors responsible for defects of building.

1.2   Statement of the Problem

Most buildings in Nigeria are faced with maintenance challenges resulting in decreasing and ultimate defects of various levels. While the 1984 version of BS 3811 defined maintenance as the combination of all technical and associated administrative actions aimed at retaining an item and bring it to a level in which it can be performed its expected function, BS 3811(1974) defined building maintenance as work done to keep a building in, or restore it to its initial state, or to a currently acceptable standard. To retain implies that defects are prevented from developing by carrying out work in anticipation of failure. To restore means that minor defects had already occurred before they are corrected. For facilities to continue to perform its expected functions, some degrees of improvement are therefore needed on the longevity of the building as standards of comfort and amenity arise where there are primary requirements for maintenance. The acceptable standard must not be less than that necessary to meet them and the acceptable standard must sustain the utility and value of the facility. This study will therefore investigate the assessment for controlling of dampness in an existing building in Nigeria.

1.3   Research Questions

This research will be carried out to answer the following research questions:

i)             what is the prevalence of dampness in an existing building in Nigeria?

ii)           what are the effects of dampness in an existing building in Nigeria?

iii)         what are the reasons for dampness in an existing building in Nigeria?

1.4   Objectives of the Study

The broad objective of this study is to investigate the assessment for controlling of dampness in an existing building in Nigeria. The specific objectives include:

i)             to identify the prevalence of dampness in an existing building in Nigeria

ii)           to survey the effects of dampness in an existing building in Nigeria

iii)         to inquire the reasons for dampness in an existing building in Nigeria

1.5   Significance of the Study

This study will help to intimate the government by giving them power to enforce law  and safe guard the lives and properties of the citizenry that lives in housing general and life of the buildings by ensuring strict enforcement of housing and safety policies. It will also enlighten developers on the needs for them to involve professionals in construction in order to avoid structural failure and collapse of buildings. It will serve as a foundation upon which research of this kind can be conducted and will also add to the related literature in the area of urban and regional planning.

1.6   Scope of the Study

This study will be carried out among selected housing estates in Lagos State, Nigeria. Information collected from these workers shall be subjected to further analysis and the results got from it shall be final.

1.7   Limitation of the study

The study will be faced with a lot of challenges and one it the problem of finance. There is not going to be enough funds to print questionnaires and to also transport the researcher to meet the desired respondents. Another one is time; the researcher is currently busy with the demand of his academics. A lot of assignments are available for the researcher to do and coupled with his desire to read and learn at the same time. These are the major challenges of this study.

1.8   Definitions of Terms

The following terms were used in the course of this study:

Assessment: the evaluation or estimation of the nature, quality, or ability of someone or something.

Building collapse: A building undergoes progressive collapse when a primary structural element fails, resulting in the failure of adjoining structural elements, which in turn causes further structural failure.

Controlling: determine the behavior or supervise the running of.

Dampness: the presence of unwanted moisture in the structure of a building, either the result of intrusion from outside or condensation from within the structure. A high proportion of damp problems in buildings are caused by condensation, rain penetration or rising damp.

REFERENCES

Adejimi, A., (2005). Poor Building Maintenance are Architects Free from Blames? A Paper Presented at the ENHR International Conference on Housing; New Challanges and innovations in Tomorrow’s Cities. Iceland 2005.

Addleson, L., (1977). Technical study 3. Diagnosis; principles and procedures (AJ guide to building failures), Architects’ Journals, Vol. 165, pp.415-19.

Melvin E., (1992). Plan, Predict, Prevent: How to Reinvest in Public Building Special Report no. 62. Chicago, Illinois: APWA.

Olagunju, R.E., 2012, Predictive Modelling for Sustainable Residential building Maintenance in Developing Countries: A Nigerian Case. Interdisciplinary Journal of Contemporary Research in Business. 4(6);1237-1283.

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for international clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour

32    Other Projects pdf doc

  1. Political Science
  2. Psychology
  3. Public Administration
  4. Public Health Research Project
  5. More Research Project
  6. Transportation Management
  7. Nursing

Education

 

See Other Essay Here

 

Full Project – ASSESSMENT FOR CONTROLLING OF DAMPNESS IN AN EXISTING BUILDING IN NIGERIA

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!