Full Project – APPLICATION OF DUE PROCESS IN EXISTING PROCUREMENT METHODS IN NIGERIA

Full Project – APPLICATION OF DUE PROCESS IN EXISTING PROCUREMENT METHODS IN NIGERIA

Click here to Get this Complete Project Chapter 1-5

ABSTRACT

This research work looks at Due Process Application in the procurement of construction projects in Nigeria. It gives a brief background of the introduction of due process generally in the Nigerian public sector and specifically in the construction industry.

This research goes further to highlight the gains made by the introduction and application of due process in construction projects. This was achieved by interviews and administering of questionnaires, which focused on the awareness/understanding of the concept of due process by project participants in the Nigerian construction industry.

This project also looked at the effectiveness of the application of due process procedure in the Procurement of construction project, since it’s adoption. It further asserts that ‘application or non-application’ of due process procedure or mechanism affects project delivery.

This research finally recommends that due process procedure should strictly be complied with and further extended to other tiers of Government, which are the State and Local Government. In doing this the gains so far made in the procurement of construction projects in the public sector would be fully harnessed.

CHAPTER ONE

INTRODUCTION

1.1       BACKGROUND TO THE STUDY

The construction industry activities include procurement of goods and services as well as the execution of a variety of physical structures and infrastructure (Ayangade, Wahab and Alake 2009), using different procurement methods.  The activities of construction industry has helped in  contributing to Gross Domestic Product (GDP), Gross fixed capital formation and creation of high level of employment to the changing professionals (Wahab, 2005).  In industrialized countries, the building industry is responsible for up to 22.00% of the GDP and employs up to 12.00% of the total labour force, but in Nigeria, it is responsible for 16.00% of the GDP and employs up to 20.00% of the labour force (Akindoyeni, 2004).  The construction industry has many features which set it apart from other process industries and which accentuate the need for professional engagement.  Various methods have been used for procuring building and other infrastructural facilities in the country.  One of the changes and new trends, which now influence the procurement system in the country, is the increasing fragmentation of the stages involved in construction process (Bamisile, 2004).

Until 1999, Nigeriahad practically institutionalized corruption as the foundation of governance.

Hence institutions of society easily decayed to unprecedented proportions as opportunities were privatized by the powerful. This process was accompanied, as to be expected, by the intimidation of the judiciary, the subversion of due process, the manipulation of existing laws and regulations, the suffocation of civil society, and the containment of democratic values and institutions. Power became nothing but a means of accumulation and subversion as productive initiatives were abandoned for purely administrative and transactional activities.  The legitimacy and stability of the state became compromised as citizens began to devise extra-legal and informal ways of survival. All this made room for corruption. (BPP website).

There was therefore an urgent call for Procurement Reforms and enthronement of Due Process in the Nigerian public Sector. It is as a result of this, that due process was established in 2001.

Nigeria nation has lost several trillions of Naira on poorly executed contracts, bad workmanship, collapsed structures, delayed and abandoned projects, and the multiplier economic and social benefits derived from such projects are unachievable (Ajator, 2004).  The problems of capital development program from the era of military dictatorship were characterized by full paid ghost projects, poorly executed or even abandoned projects.

Over the years in Nigeria, the public procurement system has been described to be characterized by non-compliance with the principles of tendering process in the selection of contractors that have the financial, technical and managerial know-how to execute projects to time, cost and quality ends. The increasing reports on the abuse of public procurement system in the three tiers of government in Nigeria have led to huge losses of resources in various public projects [BMPIU, 2005]. Oboirien, 2005 showed that the country might have lost billions of money over the years as a result of abuse of procedures, inflation of contract costs, lack of transparency, competence based competition and merit as the fundamental criteria for the award of public contracts. There was also the problem of influence peddling, sycophancy, and use of primordial considerations. These abuses led to abandonment of government projects, non- value for public treasury, high cost of procurement and others.

Obasanjo (2004) rightly observed that Nigeria had practically institutionalized corruption as the foundation of governance. Hence, institutions in the society easily decayed to unprecedented proportion as opportunities were privatized by the powerful. Power became nothing but a means of accumulation and subversion as productive initiatives were abandoned for purely administrative and transactional activities.  The legitimacy and stability of the state became compromised as citizens began to devise extra-legal and informal ways of survival. All this made room for corruption.

There was therefore an urgent call for Procurement Reforms and enthronement of Due Process in the Nigerian public Sector. In 2001, the Federal Government issued New Policy Guidelines for procurement and award of contracts in Government Ministries/Parastatals (Circular F. 15775 of 27th June, 2001).

In the President Obasanjo political dispensation, the Budget Monitoring and Price Intelligence Unit (BMPIU), also known as Due Process was inbuilt into the capital budgetary system, so as to ensure that projects started are completed within stated criteria.

Due process implies that governmental activities and business can be carried out openly, economically and with transparency without favouritism and corruptible tendencies (Ezekwesili 2004). The essence of this is to ensure that rules and procedures for procurement are made in such a way as to be implementable and enforceable. It is hoped that this Due Process should put an end to “the Business as Usual Syndrome” in Nigeria

Adesugba (2004) opined that in order to provide additional boost to government anti-corruption policy, an office of the BMPIU, otherwise known as Due Process (D.P) was established in June 2003.  To realize the objective for which it was set up, BMPIU was headed by a financial specialist, Mrs. Obiageli Ezekwesili and staffed with experts in financial regulations, project management and corruption prevention.

The seemingly professional failure of Nigerian project planners, designers and administrators to give value to capital projects has cast doubt on the credibility and relevance of construction professionals and contractors. Nigerian government since 2002 fiscal year has reservation on the import of consultancy fee scale in capital project delivery (Awosemusi 2002) and has instituted the Due Process Compliance (DPC) exercise in the planning and implementation of capital budget /projects (Ezekwesil 2002).  The goal of BMPIU is to ensure full compliance with laid down guideline and procedures for the procurement of capital and minor capital project as well as associated goods and services for all Government contracts.

The objectives of BMPIU according to Ezekwesili (2003) are as follow:

1.      To introduce more honesty, accountability and transparency into the procurement process.

2.      To determine whether or not Due Process has been observed in the procurement of services and contracts.

3.      To establish and update pricing standards and benchmarks for all suppliers to Government

4.      To ensure that only projects which have been budgeted for are admitted for execution.

5.      To harmonize existing government policies / practices and update same on public procurement

6.      To monitor the implementation of projects during execution with a view to providing information of performance output and compliance with specifications and targets.

Lock (1989) opined that the objectives of contract / project performance or management can be condensed under three headings.  A successful project is one which has been finished on time, within its cost budget and to a technical or performance standard which satisfies the end user.  The Due Process Certificate ensures that the stated criteria are met by who will be the contractor to execute any project and the originating government Ministry and Public institutions.

For any project to actually get Due Process Certificate readiness to implement, Kharbanda and Stallworthy (1989) stated some criteria for choosing the contractor to include:

i.                    Cost incentive and liability arrangement proposed

ii.                  Local currency content of the project cost and the total investment required for the project

iii.                Appreciation and knowledge of local conditions at the job site.

iv.                Quality of personnel nominated to carry out the project, with special emphasis on the project manager

v.                  Long terms meant for the project

vi.                Project organization and relationship with local subcontractors

vii.              Quality and contents of the technical proposal

viii.            Contractor’s recent experience in the design and construction of similar projects

ix.                Ability to provide the owner with technical support services

x.                  Schedule for project completion

The above criteria which are not exhaustive are similar to that used by the Due Process Unit (DPU) in contract procurement, regulation, certification, monitoring, implementation, evaluation, training and advisory.  It is worthwhile to inquire whether this DPC has impacted positively or not on the performance of public executed projects since its inception.

The introduction of Public Procurement Reforms in Nigeria followed a World Bank Country

Procurement Assessment survey conducted in 1999 which established the link between poor/weak public procurement procedures and corruption as well as its far reaching negative \consequences on national development especially in the area of infrastructural development in

Nigeria. The Assessment Report revealed that 60k was being lost to underhand practices out of every N1.00 spent by Government and that an average of ten Billion US Dollars ($10b) was being lost annually due to fraudulent practices in the award and execution of public contracts through inflation of contract cost, lack of procurement plans, poor project prioritization, poor budgeting processes, lack of competition and value for money and other kinds of manipulations of the procurement and contract award processes.

In order to address the above shortcomings, the Federal Government initiated the Public

Procurement Reform as part of its Economic Reform agenda designed to restore due process in

the award and execution of federal government contracts. This led to the setting up of the Budget

Monitoring and Price Intelligent Unit (BMPIU known as Due Process) in 2001 to implement the

Federal Government’s Public Procurement Reform Policy aimed at minimizing open abuses to

known rules, processes and standards in the award and execution of public sector contracts in Nigeria.

Following the growing Public demand that the reforms are sustained and institutionalized with

legal backing, a Public Procurement Bill was articulated in 2003/2004 by the Leadership of

BMPIU and presented to the National Assembly. The Public Procurement Bill was thereafter

passed by the National Assembly on the 30th of May, 2007 and subsequently signed into Law by

President Yar Adua on the 4th of June, 2007. (BPP website)

Today the duties carried out by the bureau of public procurement (BPP) is popularly referred to as Due Process. Hence the topic application of due process existing procurement methods in Nigeria.

1.2       STATEMENT OF THE PROBLEM

There are various procurement methods used in carrying out different project in the construction industry, of which due process is applied.

Analysis have shown that most contracts awarded by the government or its officials are awarded through corrupt means. Some of these contracts are awarded to contractors who have agreed to give the procurement official a certain percentage of the original contract amount. This encourages contractors to use substandard goods, render poor services or sometimes project abandonment (Ayodele, Charles, Akinusi& Marion 2010).

Over the period, Nigeria as a nation has lost several trillions of Naira on poorly executed contracts, bad workmanship, collapsed structures, delayed and abandoned projects, and the multiplier economic and social benefits derived from such projects are unquantifiable. It has not been easy for the nation to realize the full economic objectives. The root of all these problems is corruption ( Ejiofor 2009).

In recent years, many people are wary of doing business in Nigeria because; the cost of doing business here is predictably higher than elsewhere. There seems to be more need, now than ever, to ensure that, rules and procedure put in place for any form of procurement show adequate clarity of purpose to make them implementable and enforceable (Nwaogwugwu 2005).

There are due process criteria set for any public project to be undertaken at different government levels. Irrespective of this, there are still several abandoned public projects due to selfish reasons. It is therefore worthwhile to investigate the level and extent of the use of due process for project procurement in Nigeria.

1.3       AIM AND OBJECTIVES OF THE STUDY

The aim of this study is to assess the application of due process in existing procurement methods in Nigeria. The following are the study objectives.

(1)               To examine the level of understanding/awareness of Due Process in                                                                                                                                                            the procurement of construction projects by projects participants

(2)               To assess the effectiveness of due process in public project execution in Nigeria

(3)               To determine challenges or barriers of due process application in project procurement process in Nigeria.

1.4       RESEARCH QUESTIONS

Based on the research objectives, the following research questions have been proposed.

(1)               What is the level of awareness/understanding of Due Process in the procurement of construction project by project participants in Nigeria?

(2)               How effective is due process application in public project execution in Nigeria?

(3)               What are the challenges/barriers towards effective due process application in public procurement as it relates to the construction industry?

1.5       RESEARCH HYPOTHESES

The following null hypotheses are hereby formulated:

Hypothesis 1

H0:        There is no awareness of the application Due Process in the procurement of construction project by project participants in Nigeria

H1:        There is an awareness of the application Due Process in the procurement of construction project by project participants in Nigeria

Hypothesis 2

H0:       Application of due process procedure has no significant impact on project delivery in Nigeria

H1:       Application of due process procedure has a significant impact on project delivery in Nigeria

Hypothesis 3

H0:       There are no significant challenges and barriers to the implementation of due process in project procurement

H1:       There are significant challenges and barriers to the implementation of due process in project procurement

1.6       SIGNIFICANCE OF THE STUDY

This study is to assist the policy makers and other stakeholders on the effects of the Due Process procedure in the delivery of public projects in Nigeria.  The assessment of the Due Process application will help to ascertain the gains of its use from when it was introduced in 2001 to 2013 in contract award, performance and implementation using Due Process certifications.  Finally, this will throw more light on the importance of due process procedure as a prerequisite for project procurement used for public project delivery.

1.7       SCOPE AND LIMITATION OF THE STUDY

As it is more directly related to construction procurement, construction contract, project delivery, monitoring, implementation and evaluation.

Sampling of the professionals was limited to Architects, Quantity Surveyors, Civil/Structural Engineers, Builders and Services Engineers along with the construction firms that have handled public project contract.

This study focus on the project carried out within five years in which due process procedure was applied.

1.8       DEFINITION OF TERMS

Due Process

This is a mechanism for ensuring strict compliance with the openness, competition and cost accuracy rules and procedures that should guide contract award within the Federal Government of Nigeria.

Due Process Unit      

The Unit under the Presidency charged with budget monitoring and price intelligence. It ensures that project procurements are implemented in accordance with laid down criteria.

Due Process Methodology

The application of basic tools and criteria in project management, assessment, monitoring and evaluation of government projects to ensure transparency, integrity, competence, competitiveness and create value for money in the planning and execution of capital program by the Due Process.

Procurement

This is the process that creates, manages and fulfills contracts. It is an integral part of construction projects and it covers the overall pattern of decision made by the client in executing project

Due Process Compliance

The exercise and assurance that these basic tools and criteria in the planning and implementation of capital budget / projects are adhered to by all the parties involved in project execution.

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

 

 

 

Need a Project Writer for a Different Topic

 

Full Project – APPLICATION OF DUE PROCESS IN EXISTING PROCUREMENT METHODS IN NIGERIA

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!