Full Project – REPORT ON THE FABRICATION OF SIEVE SYSTEM
Click here to Get this Complete Project Chapter 1-5
ABSTRACT
The construction of sieves system was carried out in the Engineering workshop, Institute of management and technology, Enugu.
The aim of this project is to fabricate a sieve system, which is capable of separating solid particles of various sizes.
The construction was carried out in order to analyze the sizes of particles.
The component parts of the sets of sieve and their dimension are as follow:
Height of sieve –80mm
Number of sieve –4
Diameter of sieve –230mm
Shape of sieve –cirular
Height of sieve set –760mm
Mesh/hole sizes – top –6.0mm, 2nd 5.0mm, 3rd 3.0mm bottom 1.0mm downwards respectively.
In constructing of this sieve system, some factors were taken into consideration and they are:
-the capacity of the sieve
-the type of mixture that can be filtered in it
-the types of properties and decomposition of the mixture.
-the type of material to be used for constructing the sieve.
The cost which is the determinant, factor in fabrication of any equipment.
These factors, help greatly in the fulfillment of the objective of this project study.
At the end of the fabrication, a sieve equipment was construct with specified dimension.
TABLE OF CONTENT
CHAPTER ONE
1.0 INTRODUCTION
CHAPTER TWO
LITERATURE REVIEW
2.1 HISTORY OF SIEVE
2.2 THEORY OF SIEVE
2.3 SCREENING
2.4 STANDARD SCREEN
2.5 MATERIAL BALANCES OVER SCREEN
2.6 EFFECTIVENESS/EFFICIENCY
2.7 SCREEN ANALYSIS
2.8 TYPES OF SCREENING
2.9 EFFECT OF MESH SIZE ON CAPACITY OF SCREEN17
CHAPTER THREE
3.1 MATERIALS OF CONSTRUCTION
3.2 ANALYSIS OF MATERIAL OF CONSTRUCTION
3.3 MAINTENANCE OF SIEVE COMPONENT
3.4 SAFETY PRECAUTION
CHAPTER FOUR
4.1 FABRICATION PROCEDURE
4.2 LAYOUT
4.3 FABRICATION OF SIEVE PLATE
4.4 SMOOTHENING AND FILLING
CHAPTER FIVE
DISCUSSION
CHAPTER SIX
CONCLUSION AND RECOMMENDATION
REFERENCE
APPENDIX
CHAPTER ONE
INTRODUCTION
Generally, all chemical engineering mostly deals with the construction of sieve among others construction in order to fulfill the theory of separations technique. This construction is carried out so as to achieve and put to practice chemical process with the help of some component for equipment construction procedures.
Sieving equipments produces a nice separation of solid particles, although artificially, by allowing the social particles to pass through the pores or the a pasture, which consists of orderly, arrange set of sieves which is arranged in manner with their facilities sizes and shapes.
Sieving equipments operates satisfactory with reasonable coarse and fine particles, so that separation can be done they have high sensitive efficiency, but few have been built since the development of separation of particles, because of the lost and the procedures involved and the labour needed to clean the sieve plate and to handle the sieve equipment.
Moreover, in the construction of set of sieve, we have to bear certain qualities in mind to portray such as determination of size and shape of the equipment which contributes to the efficiency of the equipment.
However, the operation has evolved as a particle at rather than a theoretical science, nevertheless, its theory has received steady attention since the pioneering work of some important scientist half a century ago.
They are usually used in large industries like mining, coal, gold, diamond and pharmaceutical etc, because of its importance and efficiency and would not be seen commonly.
Above all, the purpose of this project is to fabricate a set of sieve which sole aim is for separation of solid particles of different size by passing through the mesh with the help of shaking and larger particles retained on the mesh (oversized) and the particles that passes through (undersized) enables us to separate the particles.
Get the Complete Project
This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.
Click here to Get this Complete Project Chapter 1-5
You can also check other Research Project here:
- Accounting Research Project
- Adult Education
- Agricultural Science
- Banking & Finance
- Biblical Theology & CRS
- Biblical Theology and CRS
- Biology Education
- Business Administration
- Computer Engineering Project
- Computer Science 2
- Criminology Research Project
- Early Childhood Education
- Economic Education
- Education Research Project
- Educational Administration and Planning Research Project
- English
- English Education
- Entrepreneurship
- Environmental Sciences Research Project
- Guidance and Counselling Research Project
- History Education
- Human Kinetics and Health Education
- Management
- Maritime and Transportation
- Marketing
- Marketing Research Project 2
- Mass Communication
- Mathematics Education
- Medical Biochemistry Project
- Organizational Behaviour
- Political Science
- Psychology
- Public Administration
- Public Health Research Project
- More Research Project
- Transportation Management
- Nursing
Full Project – REPORT ON THE FABRICATION OF SIEVE SYSTEM
Frequently Asked Questions
Our Customers are Happy
Ademola A.
I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!
Kwabena K.
I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!
Michael H.
Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.
Fatou B.
I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!
James O.
https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!
Ngozi E.
I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!
Ama S.
I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!
Sarah W.
The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.
Emmanuel T.
Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.
Aisha N.
Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!