CHAPTER ONE

  • INTRODUCTION

 1.1 BACKGROUND OF THE STUDY

Production planning deals with the determination, acquisition and arrangement of all facilities necessary for future manufacturing operations. The process involves also the allocation and scheduling of the resources to produce the desired goods and services in the required amounts at minimum total cost (that is, determining start, completion and delivery time) machine loading and also storage and handling items.

Effective production planning and control depends on information, meaning that production planning should take awareness of change in both the environment and within the organization. This is because changes in the environment impose change in the organization.

An effective production planning and control should know at any point in time the following questions:

  • How work is done?
  • Which machines are being used?
  • How much labor is available?
  • What raw materials and other inputs are currently in the stock, interruption may result from none or late delivery of materials, Machine breakdown, strikes and staff lateness due to public transport difficulties.

 

Breakdown in communication between the shop floor and the controlling unit will delay product. This has to be a continuous flow of information on workload, raw material availabilities and maintenance activities. Activities relevant to production includes design specification of dimensions, materials inputs and quality, ensuring the compatibility of one component with the others, description, issuing detailed instruction to supervisors, inspections, quality control, packaging, loading and dispatch.

Therefore this study explain why Nigerians firm fail to follow the rule of production planning and control. And also to know what manufacturing firms encounter in their attempt to carry out their production planning and control.

The firms that does not plan and control their production can be faced with the following problems:

  • Inadequate sources of raw material
  • Shortage of labor force
  • Breakdown in machines used in the organization.
  • Communications breakdown.

 

1.2  STATEMENT OF THE PROBLEM

Production planning is subject to complex movement of items between work unit and operations, and it is easy for batches mistakenly to be broken up, machine loading can be complicated, also further difficulties that affect production planning and control are

  • It might not be possible to avoid particular batches lying around for long periods between operations.
  • Materials can fail to arrive at specific work points preventing the processing of work in progress and causing great descriptions to the entire system.
  • Extensive documentation movement of batches around a factory may be required.
  • Frequent movement of goods and material creates the need for the storage of items in many places and of many places and of many times during the production process.
  • Coupling with a breakdown in the system this will cause to operate in its entirely following just a minor hold-up. Input materials will have to be put into storage while the stoppage is sorted out.
  • Arranging the housing of the flow of output, especially when customers demand is low. When batches planning for continuous flow of production is perhaps easier than that of items involved because of less detailed, scheduling (and associated paper work) is required. There is a single low of work through the system, changes to which after simple to implement on the other hand, planning for continuous production is inflexible in that labour and other resources cannot readily by re-delayed among difference machines in the event of a breakdown.

1.3  THE OBJECTIVES OF THE STUDY.

  • To determine the effects of poor scheduling in meeting jobs completion times.
  • To examine the rules adopted in job loading and their impact on job flows.
  • To identify the specific routine procedures adopted by the firm and the overall impact on production process.
  • To investigate whether the system of production planning and control is widely practiced among Nigerian firms.

 

1.4  RESEARCH QUESTIONS

  • Does poor scheduling has any effect on the productivity of manufacturing firms?
  • Are there rules for job loading in manufacturing firms?
  • Are there steps involved in the overall impact of production process?
  • Is the system of production planning effective in the Nigeria manufacturing firms?

 

1.5  STATEMENT OF HYPOTHESES

HYPOTHESIS   I

Ho: The poor scheduling has no significant effect on the productivity of the manufacturing firms.

Hi:   The poor scheduling has significant effect on the productivity of the manufacturing firms.

HYPOTHESIS   II

Ho:  There is no rule for job loading in manufacturing firms.

Hi:   There is rule for job loading in a manufacturing firm.

 

1.6  SIGNIFICANCE OF THE STUDY.

The significant of this study is hopefully believe to be a useful and unavoidable guide for future decision makers and serve as a bench mark for future research students and other entrepreneur in the field production planning and control.

It will also be beneficial to business, organization etc. In restructuring future planning and control in production aspect. This work will also enhance the effectiveness and efficiency of manufacturing firms, in other to meet their customer’s needs and demands.

This work will also be of benefit to recommend way through which the organization could reduce production cost to its best level in other to achieve its desired profit level.

 

  • SCOPE/DELIMITATION OF THE STUDY/IMITATION OF THE STUDY.

This research work is an indebt on production planning and control impact in a manufacturing firm, using Nigeria Bottling Company Aba, as a case study.

THE NIGERIA BOTTLING COMPANY ABA

This study will cover the entire production planning and control departments. The various sub-sections in the department shall from nucleus of the study and all their subordinates that are related.

The limitation of the study is within the reach of the selected case study due to some factors, the factors are as follow lack of sufficient finance, the work were limited to some extent because of poor finance and high cost of transport, there was no time to carry out all the research work as such. The fact were not gotten as at when needed.

1.8  DEFINITION OF TERMS

  • PRODUCTION: This is the process of co-coordinating man, materials and machine to create physical goods and services that will satisfy human wants and needs.
  • PRODUCTION PLANNING: This is the regulation, coordination and control of production facilities so as to meet a set delivery data at a reasonable cost.
  • PRODUCTION CONTROL: This is the function of directing or regulating the orderly movement of goods through the entire manufacturing cycle from the requisition of the raw materials to the delivery of the finished products to meet the objective of the customer services, minimum manufacturing efficiency.
  • MANUFACTURING PROCESS: It is defined as any organization or an arrangement that convert raw materials into finished products (input process and output process ) of direct materials, direct labour and factor overhead cost that have been accumulated some natural classification and allocation so as to reject the cost involved in the production of an item.
  • SCHEDULING: A scheduling is a program of activities to determine the production of a particular term of specific times, accompanied by list of priorities and contingencies for when things do not work it as intended.
  • MACHINE LOADING: Machine loading decision concerns which machine (or collection of machines) is to be used for which purpose and for which periods.
  • CAPACITY PLANNING: This means relating to the forecast level of demand for its products consist and show how it was distributed and retrieve of the instrument.

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for international clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

You can also check other Research Project here:

 

 

Full Project – The impact of production planning and control on a manufacturing process

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!