Full Project – CRISIS MANAGEMENT IN AN ORGANIZATION

Full Project – CRISIS MANAGEMENT IN AN ORGANIZATION

Click here to Get this Complete Project Chapter 1-5

CRISIS MANAGEMENT IN AN ORGANIZATION

(A Case study of Anammco Plc Emene, Enugu State)

 

TABLE OF CONTENT

Title page

Approval page

Dedication

Acknowledgment

Abstract

Table of content

CHAPTER ONE

1.0   INTRODUCTION

1.1        Background of the study

1.2        Statement of problem

1.3        Objective of the study

1.4        Research Hypotheses

1.5        Significance of the study

1.6        Scope and limitation of the study

1.7       Definition of terms

1.8       Organization of the study

CHAPETR TWO

2.0   LITERATURE REVIEW

CHAPETR THREE

3.0        Research methodology

3.1        sources of data collection

3.3        Population of the study

3.4        Sampling and sampling distribution

3.5        Validation of research instrument

3.6        Method of data analysis

CHAPTER FOUR

DATA PRESENTATION AND ANALYSIS AND INTERPRETATION

4.1    Introductions

4.2    Data analysis

CHAPTER FIVE

5.1    Introduction

5.2    Summary

5.3    Conclusion

5.4    Recommendation

Appendix

  

ABSTRACT

Crisis are inherent in any human enceinte and perform an integral part in any organization and must be managed. It generates problems between employees and the management, between groups in the organization and affects the society at large. The researcher finds out the causes of Crisis and management of it in our case study Anammco Plc Emene Enugu state chasing the working system, non-payment of wages and salary as at when due, non-employees participation on matters affecting them, poor working conditions and management insensitive of employees welfare. These result to poor working morals, low productivity on the part of the employees.

After analyzing the data collected from both secondary and primary, the researcher suggested or holds that Crisis can be reduced through two-way communication system, operative open door policy, ensuring good working condition. These preventive approaches were confirmed after testing the hypothesis. The research methodology employed were questionnaire, collection of relevant textbooks, in all addition, statistical models – Chi-Square is used in calculating the sample size and testing of hypothesis.

It was recommended that management must be sincerely concerned with the welfare of employees, solicit and respect suggesting of employees and must realize that participatory management is the best approach to reduce Crisis and ensures obedient and higher productivity.

CHAPTER ONE

INTRODUCTION

1.1    Background of the Study

Industrial /organizational crisis constitute a very important component of the industrial relations system. They can be seen as any disputes between employers and worker or between workers and workers, which is connected with the employment or terms of employment and deployment or terms of work. They involve the pursuit of incompatible on at least seemingly incompatible goods by two or more parties so that gains for one party result in loss for the other. Organizational crisis are usually more exciting to observers and so invariably attract greater attention and comment than peace. As a result in all countries, newspapers contain more reports about labor disputes than Labour harmony. Keller (1954) holds two views concerning industrial conflict or Crisis.

The harmony. Relation view: holds that conflict is unavoidable and only occurs because of abnormality in a stable and well integrated organization which has restore a natural homoeostasis while the other realistic view: hold that Crisis is inherent in any human encounter. It performs an integral part in any dynamic social system and is necessary element of change. Dispute is the essence of industrial relations because the structural features of organization necessarily result in tensions among persons on different strata. The industrial relations system consists largely of maintaining a balance among these tensions in the interest of pressuring a going enterprise. Organizational crisis are of the most part normal and even necessary; they have both advantages and disadvantages for the enterprise, demands by worker forces management to search for efficiency or for new market in order to meet new demands. On the other hand, demand which impair the efficiency of the enterprise or result in an unacceptably higher costs to the customer, threaten the enterprise’s future. For the society as a whole workers demands have been an engine for social porgies brining shorter working how’s, longer holidays, better working conditions and many other improvements over the years. But the welfare of society also may be adversely affected by productivity where prices are forced up or efficiency excessively lowered and by the inflationary effects of increase in labour costs not covered by increase productivity. Although Crisis are an element in the maintenance of equilibrium in industries comes abnormal, dysfunctional or pathological. Examples include Crisis accompanied by pervasive violence and disputes which results in major economic and social disorganization of a community. In the cost majority of industries, the sources of disputes are to be found in tensions innate to the industrial relations system. Studied have shown that where people work together in an enterprises many interests are to be found, some shared, some not. The employer wants the operations to be a successful as possible whether judged by profit, non –profit or other measures of efficiency. The needs to keep his labour costs reasonably commensurate with those of his inspires managers and supervisors, but in addition they have other interests of their own as also the employees. On the worker’s side their diverse interests maximizing wages and improving the condition under which they supply their Labour, ensuring the securing of their job. Fair treatment from their managers, avoiding any unduly tough work place, belonging to congenial work groups and working in a state and reasonably pleasant environment. In addition, all staff in the enterprise may have outside interests, which affect their life within it. For example, work may share common objectives with comrades elsewhere through their trade union or even under aims through political movements, which influences their conduct at work. Their interests may conflict with the achievement of enterprise goals set by management.

1.2     Statement of Problem

In view of the fact that an employee spends the greater part of the day in his place of work and most active vigorous part of his life as a workman, it is of permanent importance’s that working conditions should be healthy, convenient and attractive, that the work itself should be as interesting as possible and that relations among the employees themselves and between employees and management should be cordial and co-operative and not confrontational.  It is in this context that we should identify the necessary skills for the effective management of industrial /organizational Crisis. It is the contention of this research work that for management of industrial Crisis to be effective, management and workers union must be knowledgeable about the organizational process that impinge on the workers and must be able to diagnose the environment of employees. This can be achieved through the power of information. Information can be even more important than the traditional tangible resources because rational problem solving and influence by presentation are essential in a complex setting. The control of scarce information by management on what motivates specific people, for instance, or on outcomes or processes related to organizational goals can enhance one’s problem salving ability. Thus, information is power. Curiously enough, although workers union have as their central concern the improvement of the working conditions of their members; but they do not take the workers interests and needs as the starting point of negotiation. Instead the conditions of service as laid down by management are the focal point: However, advances in the behavioral sciences have enabled us to know about the worker. It is therefore imperative for trade unions and management to have a good knowledge about the workers. Again, while workers and management are concerned about improving the condition of work which often are interpreted narrowly to include only salaries, wages and fringe benefits the quality of the actual works undertaken by a worker hardly ever features as an area of theorists and researchers on job design that some jobs are ultrasonically more satisfying than others. Workers alienation has been found to stem from the nature of the jobs, jobs that the worker has no measure of control over the methods to be used, tend to repel to worker, lower his morale and reduce his performance.

1.3    Purpose of Study

The objective of the study generally is to secure the highest possible level of mutual understanding and good will between several interests which take part in the processes of an undertaking so as to maximize productivity for industry and real incomes for workers.

Summarily this study has the following as its objectives.

  1. The causes of organizational crisis.
  2. The effects of Organizational crisis
  3. The management process of organizational crisis
  4. The outcome of an effective organizational crisis

1.4    Research Questions

The study has the following questions as its focus

  1. What are the causes of organizational crisis?
  2. Does organizational crisis affect organizational performance?
  3. Does effective crisis management depends on the management of the organization?
  4. What is the Outcome of an effective organizational crisis?

1.5    Research Hypotheses

The study formulated and will test the following hypotheses

H0: There is no significant relationship between organizational crisis and organizational performance.

H1: There is a significant relationship between organizational crisis and organizational performance.

H20: There is no significant relationship between effective management crisis and organizational management process.

H21: There is a significant relationship between effective management crisis and organizational management process.

1.6     Scope and Limitation of the Study

For the purpose of this study, we shall focus primary on the intergroup types of organizational Crisis among the staff of our case study organization. The scope of this cover the management and worker’s union Crisis and the strategies or steps in managing Crisis between this two groups with particular reference to Anammco Emene Plc Enugu.

During the process of this research, the researcher encountered some constraint, which hindered the collection of information.

TIME:  The researcher wishers to state it clearly that the period   under which this study is done is short especially when academic commitment such as writing of term papers, assignment, tests and exams.

Money:   A research paper of this nature requires a lot of money, which is not readily available to a student like the researcher. The researcher is handicapped financially, and thereby cannot afford to make an intensive research.

Lack of facilities also reduced the potentiality of this study. The researchers do not have easy access to books and previous studies by other authors based on this study.

Because of all the above limitations the researcher is then recommending that other researchers can make further investigations and improve on this study.

1.7     Significance of the Study

The research topic management of industrial Crisis will help management; entrepreneurs to know various preventive Crisis approach, be confident and make policies that can reduce these Crisis which hinder the attainment of business mission.

Secondly Government will know how some of their decision gear industrial Crisis especially the issue of change without adequate notification, planning and use of diplomacy.

1.8     Definitions of Terms

Industrial Employees – will include the whole web of workers under the employment of both service and manufacturing industries.

Conflict – A condition of objectives incompatibility between valves or goals; as the behaviour of deliberately interfering with another goal achievement.

Industrial relations – Concerns human relations in the   process of production.

Management – The ability to get thing done through The Use of People.

1.9    Organization of the study

The study is divided into five chapters. Chapter one deals with the study’s introduction and gives a background to the study. Chapter two reviews related and relevant literature. The chapter three gives the research methodology while the chapter four gives the study’s analysis and interpretation of data. The study concludes with chapter five which deals on the summary, conclusion and recommendation.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for international clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour

32    Other Projects pdf doc

  1. Political Science
  2. Psychology
  3. Public Administration
  4. Public Health Research Project
  5. More Research Project
  6. Transportation Management
  7. Nursing

Education

Essay 

 

 

 

Full Project – CRISIS MANAGEMENT IN AN ORGANIZATION

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!