Full Project-EFFECTS OF BUDGETING AND BUDGETARY CONTROL ON THE PERFORMANCE OF MIDDLE MANAGEMENT

Full Project-EFFECTS OF BUDGETING AND BUDGETARY CONTROL ON THE PERFORMANCE OF MIDDLE MANAGEMENT

Click here to Get this Complete Project Chapter 1-5

EFFECTS OF BUDGETING AND BUDGETARY CONTROL ON THE PERFORMANCE OF MIDDLE MANAGEMENT

 

CHAPTER ONE

1.0       INTRODUCTION

A budget is a “financial and/or quantitative statement, prepared and approved prior to a defined period of time, of the policy to be pursued during that period for purpose of attaining a given objective. It may include income, expenditure etc.

The establishment of executives to requirement of a policy, and the continuous comparison of actual with budgeted result. A budget is thus a standard with which to measure the actual achievement of people, departments, firms etc.

In large firms, a system of budgetary control is used. Budgetary control is operated with a system of standard costing because both are interrupted but not interdependent. Budgetary control can be operated without standard costing, but budgetary control is certainly facilitated where standard costing is in operation. one the other hand, it would be difficult to operate a system of standard costing if budgets where not in use.

The behavioural aspect of budgeting is that researcher have failed to adequately expatiate on over the years, in which the research is focused.

1.1       BACKGROUND OF THE STUDY                              

Nestle was founded in 1866 by Henri Nestle having its headquarter in vevey, Switzerland, and today the world biggest food and beverage company employing around 265,000 people and having factories or operations in almost every country in the world which Nigeria is one of them.

Nestle being a manufacturing company take consonance of budgeting and budgetary control in order to achieve the budgeted plan of the organisation. Also in a large company like this (i.e Nestle), the budget is usually the responsibility of a budget committee.

Normally the Chief Executive is the chairman of the committee, but the responsibility for operating the system is undertaken by a budget offices, and other representative from different apartment.

The company, strategy is guided by several fundamental principles, its existing products grow through innovation and renovation while maintaining a balance in geographical activities and products lines.

1.2       STATEMENT OF THE PROBLEM

Two much attention is paid to the techniques of budgeting but greater importance are the behavioural aspects i.e the process accepted to those who have to operate it.

–              does it motivate them?

–              does it have any effect on their performance or productivity?

–              do they feel threatened by it?

In some organisation, taking the above questions into consideration will result to improvement in the effectiveness of the communication within the organisation. It is an important avenue of communication between the top and middle management as regards the firm’s objectives. Then when the budget is finalized, it communicates the agreed plans to all staffs involved.

Also, the involvement of middle management with the process of budgeting control and the establishment of clear targets against   which performance can be evaluated has been found to be a good motivation. Favourably planned budgeting ensures proper participation, congruence is encouraged and motivation increases.

Budgeting provides clear guidelines for mangers and supervisors and it is a major way in organizational objectives are translated into specific tasks and objectives related to individual managers.

However, failure to involve middle management in the process of budgeting and budgetary controls will result to the following:

–              poor performance of the middle management;

–              poor motivation of the worker;

–              Lack of feeling of job security on the part of the staff;

–              Bad handled budgetary systems with undue pressures

1.3       OBJECTIVES OF THE STUDY

For the purpose of this research, the objective will involve:

–              filling a gap in human knowledge;

–              examining  the effects that budgeting system have on the performance of middle management;

–              finding out whether budgeting and budgetary controls really motivate the middle management of an organisation;

–              finding out the problems that staff may have concerning budgets and budgetary control.

1.4       STATEMENT OF HYPOTHESES

For the purpose of this research work, the hypothesis to be tested are:

a)       Hi:     That budgeting system and standard setting have

effects on the performance of middle management staff.

Ho:    That budgeting system and standard setting does not have effects on the performance of middle management staff.

b)      Hi:     That involvement of middle management staff in the

process of budget making and setting standard motivates and influence the performance of staff.

Ho:    That the involvement of middle management staff in the process of budget making and setting standard does not motivate and influence performance of staff.

1.5       SIGNIFICANCE OF THE STUDY

Until recently, most researchers on budgeting and budgetary control focused on the financial aspect. Infact too much attention is paid particularly by accountants to the mechanics of budgeting and in the process neglecting the far more important aspect i.e behavioural aspect.

This study is therefore needed to draw attention to this important aspect of budgeting. Moreover, the contribution of this research work is to enable the manufacturing organisation take into consideration the abilities of their staff when setting the standards and making budgets.

In addition to that, this study is designed to contribute to the existing ways of staff motivation of specially manufacturing organisation which will find this study useful because it is designed to encourage the participative concept in management.

Lastly, students and other prospective researchers will also find this study useful in filling a gap in their knowledge since it is designed to contribute more to the existing knowledge on the behavioural aspect of budget and budgeting control.

1.6       SCOPE AND LIMITATION OF THE STUDY

Every organisation consists of three levels of management, which are:

The top management consists of organizational directives, chairman of the company, managing director etc. The middle management include divisional managers, production controllers, lead of department etc. while lower management comprises of work supervisor, work foreman etc. for the purpose of this research work, only the middle management will be focused on and examined in relation to budgeting and budgetary control.

However, other limitation to this study are financial constrain and time constrain which are very limited.

1.7       DEFINITION OF TERMS

1)           BUDGETING: A budget is a statement of planned actions in monetary terms indicating revenue to be generated, expenditure to be incurred and capital items to be financed so as to achieve a given objective for a particular period (usually a year).

2)           BUDGETING CONTROL: This is when some form of monitoring and control are exercised on planned action (budget). The control starts from the point of preparation of the budget to approval, implementation comparison with actual and feedback with recommendation for remedial or control action.

3)           STANDARD COST: This is the expected cost define at the beginning of a period and use to measure performance at the end of the period.

4)           VARIANCE ANALYSIS: This refers to the measurement of deviation of actual cost from planned actions or expected cost and the breakdown of such deviation by cause and responsibility so that remedial action can be taken or opportunities can be capitalized upon.

 

REFERENCES

John Ndidi Augustine Nwafa (Snr. John) 2005 Understanding of cost Accounting.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

1, Accounting Research Project

  1. Adult Education
  2. Agricultural Science
  3. Banking & Finance
  4. Biblical Theology & CRS
  5. Biblical Theology and CRS
  6. Biology Education
  7. Business Administration
  8. Computer Engineering Project
  9. Computer Science 2
  10. Criminology Research Project
  11. Early Childhood Education
  12. Economic Education
  13. Education Research Project
  14. Educational Administration and Planning Research Project
  15. English
  16. English Education
  17. Entrepreneurship
  18. Environmental Sciences Research Project
  19. Guidance and Counselling Research Project
  20. History Education
  21. Human Kinetics and Health Education
  22. Management
  23. Maritime and Transportation
  24. Marketing
  25. Marketing Research Project 2
  26. Mass Communication
  27. Mathematics Education
  28. Medical Biochemistry Project
  29. Organizational Behaviour
  30. Other Projects
  31. Political Science
  32. Psychology
  33. Public Administration
  34. Public Health Research Project
  35. More Research Project
  36. Transportation Management
  37. Nursing

 

 

Need a Project Writer for a Different Topic

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!