Full Project – INCIDENCE OF A BUILDING COLLAPSE IN NIGERIA CAUSES AND REMEDY

Full Project – INCIDENCE OF A BUILDING COLLAPSE IN NIGERIA CAUSES AND REMEDY

Click here to Get this Complete Project Chapter 1-5

INTRODUCTION

CHAPTER ONE

1.1  Background of the Study

Over the last 10 years, the incidence of building collapse in Nigeria has become so alarming and does not show any sign of abating. Each collapse carries along with it tremendous effects that cannot be easily forgotten by any of its victim. These include loss of human lives, economic wastage in terms of loss of properties, jobs, incomes, loss of trust, dignity and exasperation of crises among the stake holders and environmental disaster (Ede 2010).

Buildings and the provision of safe and affordable homes are major contributors to sustainable development and through the centuries, these have been important aspects of the socio-economic development of humans. However the contribution of buildings to Nigeria’s development has not yielded the desired potentials because of failed projects and more recently their poor functional performance. It is common to hear of incidents of building collapse in major Nigerian cities like Lagos, Port Harcourt, Abuja, Enugu and Ibadan. There were over 112 incidents of building collapse in Lagos alone between December 1978 and April 2008 (Chinwokwu, 2000).

Sadly however, the issues of building collapse during and after construction has failed to receive the attention it deserve from public and private clients and other construction sector stakeholders in Nigeria. This is ironic because of the obvious consequences of building collapse on urban and socio-economic development. Buildings that meet desired performance requirements add value to the national asset stock and enhance its Gross Domestic Product. Such buildings are sustainable because they meet the needs of the present while also contributing to future needs. There is only one alternative to sustainability; unsustainability which underperforming buildings portend to Nigeria’s economy. Several productive lives and properties have been lost in the various incidents of building collapse in Nigeria, and these losses, which would only truly be felt by future generations, have negatively impacted the socio-economic status of its citizenry (Fagbenle and Oluwunmi, 2010).

According to encyclopedia Britannica, (2004), building can be defined as a roofed and walled structures built for permanent use for man’s living, working and storage. Buildings are structures, which serve as shelters for man, his properties and activities as quoted by Ayedun et al, 2012 in Umeora C. O (2013). To obtain the desired satisfaction, they must be properly designed, well planned, constructed and maintained. Failure in building can be defined as the incapability of the building components not being sufficient to perform what are normally expected of those components. Building failure is a common phenomenon all over the world but more rampant and devastating in the developing countries like Nigeria. The rate at which building collapse in Nigeria has reached a worrisome level in view of its alarming loses in term of lives and properties. Opara (2006) opined that the causes of this monster in order to proffer adequate solution of prevention, mitigation or preparedness. Each time a building collapses accusing fingers point at major industry stakeholders that ought to hitherto play both statutory and supervisory role before, during and after erection of a structure. These stakeholders include structural and Civil Engineers, Building Contractors, and Valuers, Architects, Town Planners, Quantity Surveyors and Lands Developers. Each of the categories of stakeholders and/or professional shares a peculiar blame in any incidence of building collapse depending on the nomenclature or causes.

However, building collapse is not only peculiar to Nigeria, it happens outside the country. Many lives were lost through sick buildings e.g. Tsunami disaster of December 26, 2004 (Tsunami, 2008) in Taiwo and Afolami (2011).The risk of a building collapsing increases when the proper review is not followed. This paper therefore reviews the causes of building collapse globally.

Ayininuola & Olalusi (2004) opined that every built structure is expected to satisfy the functional objectives of safety, serviceability, and economy. The processes of construction are complex and require the services of trained professionals. They further noted that a high level of skill is needed both in designing and construction. In his research titled “Structural Stability in Nigeria and Worsening Environmental Disorder: The Way Forward” Ede (2010) noted that every structural system is designed to meet some needs and be safe to avoid loss of life, property, and damage to the environment. In a normal set up, failures are not expected within the projected lifespan of structures. But due to the imperfection in the actions of human beings and the existence of so many other external factors that influence the safety of structures, failures do occur. He also observed that the factors responsible for building collapse are complex but a well-structured model designed for the Management of building collapse can give a more realistic prediction of those ones responsible for the collapse.

1.2   Statement of the Problem

Building collapse is due to man’s negligence in some vital areas in construction such as soil investigation, incorporating design for extra loads, stress from winds, earthquakes, uneven terrain, use of substandard building materials, poor monitoring and overall poor workmanship. Madu, 2005, identified causes of building failure as due to natural occurrences such as earthquakes, tornadoes, flood, etc. Other causes according to him include factors such as omission, carelessness, leading to use of deficient structural drawings, absence of proper supervision of projects, alteration of approved drawings, use of substandard materials, corruption in the Nigerian system, building without approved drawings and translocation of building plans to different sites.

Ayinuola (2004), pointed accusing finger to all parties in the building industry, clients, architects, engineers, town planners in the local authorities and contractors stating that they have contributed to building failures in various dimensions. Tyagler et al, (2007) traced the causes of building failures to defects or deficiencies at design and construction stages. Ukpata, (2006), opined that the spate of building collapse in the country can always be traced to unsafe actions of parties involved in building process starting from clients to building consultants, contractors and users. Adebayo, (2006), opined that building collapse incidences can be controlled or minimized if the client is ready to pay for high quality materials and for expert professional services.

Building collapse in Lagos metropolis has been a subject of concern for experts in real estate management. Therefore, the study purpose is to investigate the incidence of a building collapse in Nigeria causes and Remedy, Lagos State.

1.3      Aim and Objectives of the Study

The aim of the study is to find out the incidence of a building collapse in Nigeria causes and Remedy. To achieve the set goal, the following objectives will be pursued;

  1. To examine the major causes of building collapse on properties in Lagos metropolis.
  2. To find out the social and environmental implications of buildings collapse on neighborhood in the study area.

iii. To evaluate the rate of building collapses in the country and its effects on the stakeholders in the building industry.

  1. To examine the problems of Incidence of a building collapse in Nigeria causes and Remedy.

1.4   Research Questions

In order to accomplish the objectives of the study, the research questions were generated from the aims which are stated below:

  1. What are the major causes of building collapse on properties in Lagos metropolis?
  2. What are the social and environmental implications of buildings collapse on neighborhood in the study area?
  3. What are the rate of building collapses in the country and its effects on the stakeholders in the building industry?
  4. To examine the remedies of Incidence of a building collapse in Nigeria.

 

1.5          Research Hypothesis

H0: Management of properties does not have effect on building collapse in Lagos metropolis.

H1: Management of properties has effect on building collapse in Lagos metropolis.

 

1.7    Significance of the Study

It is with great hope that this study will provide more information for the following:

The results of this study will educate the general public on the causes and Management of building collapse in Lagos State in Nigeria with a view of reducing the issues of building collapse in Nigeria.

The outcome of this study will guide the government and policy makers on ways to make and implement policies that will reduce the rate of building collapse in Nigeria.

This research will also serve as a resource base to other scholars and researchers interested in carrying out further research in this field subsequently, if applied will go to an extent to provide new explanation to the topic.

Research of this nature can be of considerable value in promoting sound methods to enhance the reduction of building collapse on the negative effects on properties.

1.7   Scope of the Study

This study on the Management of building collapse in Lagos State will cover Lagos Mainland Local Government Area on the cases on building collapse in Lagos State and carefully examining the causes and majorly will also cover the consequences/effects of the building collapse in the affected area. There have been instances of building failures in different parts of the country, cases of abandonment of housing projects mid-way which led to building collapse but our focus is mainly some part of the cities in Lagos State.

1.8       Limitations of Study

With the research at its inception, the primary glitch would be the sourcing of related literature to aid the research. Also, availability of finance geared towards the research appears to be a limitation.

1.9    Definition of Terms

Building collapse: Building collapse is the falling away of building due to man’s negligence in some vital areas in construction such as soil investigation, incorporating design for extra loads, stress from winds, earthquakes, uneven terrain, use of substandard building materials, poor monitoring and overall poor workmanship.

Building collapses: Building collapse is a building that fell due to poor maintenance and infrastructure, security, dilapidation, natural disaster which has made the building not to be habitable.

Building Management: Building management consists of the interlocking functions of creating corporate policy and organizing, planning, controlling, and directing an organization’s resources in order to achieve the objectives of constructing a standard building.

Environment: This encompasses places and spaces created or modified by people including buildings, parks and transportation systems. It is also means material, spatial and cultural product of human labor that combines physical elements and energy in forms for living, working and playing.

Abandoned building: Abandoned  building is a building that has left unoccupied by the owner or tenant for some period of time.

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for international clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour

32    Other Projects pdf doc

  1. Political Science
  2. Psychology
  3. Public Administration
  4. Public Health Research Project
  5. More Research Project
  6. Transportation Management
  7. Nursing

Education

 

 

Full Project – INCIDENCE OF A BUILDING COLLAPSE IN NIGERIA CAUSES AND REMEDY

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!