Full Project -APPRAISAL OF BUDGET AS A TOOL FOR EFFECTIVE CONTROL IN THE PUBLIC SECTOR

APPRAISAL OF BUDGET AS A TOOL FOR EFFECTIVE CONTROL IN THE PUBLIC SECTOR

Click here to Get this Complete Project Chapter 1-5

CHAPTER ONE

INTRODUCTION

1.1      Background to the Study

Establishing  an  appraisal   of  budget  is  certainly  the  most  important   act  that  any government performs  for effective control in the public  sector. Therefore, a budget is commonly understood as the focus by a government or its expenditure and revenue or a specific period of time. The generalbudget can be defined as a government plan for revenue and expenditure for the coming fiscal year.

Increasing competition is continually pushing local government council towards more efficient processes  and  slimmer  margins.  Effective  control  have  to  ensure  that  their resources  are  used  most  effectively,  the  key  to  achieving   operational   excellence, therefore, is in the effective and flexible management of resource, and this means optimizing and scheduling people, processes, vehicles, equipment, and materials so that utilization is maximized while goals are met.

Eastland  (2017)  define  resource  management  refers  to  managing  the  resources  of  a company, project or department. This mean managing resources such as finance, human skills and information technology or in a larger corporation, managing the resource over multiple departments and projects.  Resource  management  can  include  ideas  such  as making sure one has  enough  physical  resources  for  one’s  business,  but not  an overabundance so that products won’t  get used, or making sure that people are assigned to tasks that will keep them busy and not have too much downtime.

The wealth  of  any  organization  is to  a  very  great  extent  determined  by  its human resources. The place of human effort as a resource for any organizational productivity, efficiency and effectiveness in operational cannot be overemphasized.  This capacity building developing and maintaining well trained, skilled experienced and quality human resources that will carry out the various task of the organization becomes an issue of important. One of the major constraints to development is lack of adequate and effective managed human resources.  It was not surprising, therefore when Barker (2017) echoed that successful implementation .of a development plan is basically refers to the strategic measurable goals that a person, organization plans to meet within a certain amount of time.

Rahman (2014) materials constitute 70% of the bulk requirement the possibility is to curtain cost to the minimum. You have encountered checking, inspection, quality control function of material management. But amazingly it is found that most organizations takes good care of cash by providing it with high security than materials irrespective of its highest share of organizational resources. This should not be so; materials which have the lion share of the organizational resources should be provided with adequate security and should be managed properly by competent and efficient personal Cammer 1996). At thewake of 20thcentury many organizations had recognized the role of materials and most material  activities  were  carried  out by  autonomous  department  such  as  purchasing warehousing, stock  control,  and  distribution  which  at  the  same  time  was  creating problems.

As development proceeds and the structure and organization of the economy become increasing complex, the failure of financial management assures increased complexity.

As many factors have been identified it will enable the researcher to ask how and why these causes have surface, what are the conditions for proper financial management.

 

1.2      Statement of the Problem

The  challenge  in  most  organizations  has  posed  a  threat  on  the  realization  of  its development and the achievement of its set objectives. This is as a result of fundamental issues of inadequate and improper acquisition, utilization and maintenance of its human resources.

The underutilization  of human  resources  in the Lagos  State particularly  in Ifelodun Council Development  Area  Ajegunle  has  seriously  led the  organization  into  a  mess because  human  factor  is  not  properly  managed.  Mismanagement  is  another  serious problem facing our organization today and has reduced it to nothing  as people are no longer kin with their work not ready to own up to vital resources in the organization.

The  factors that  are responsible  for the failure  is financial resources  management  is neglected and has made them to lose a substantial pay of their fund through fraudulent act, indiscriminate financing,  poor  management,  lack  of zealousness  and experienced personnel and inability to utilized its financial potentials etc.

 

1.3     Aim and Objectives of the Study

  1. To identify the need of developing employee programme in an organization.
  2. To examine the impact of material resource management in public sectors  ofIfelodun Local Council Development Area Ajegunle.
  3. To investigate the causes of inadequacies in financial resource  management.
  4. To identify and ascertain some of the problems posed by materials  management.
  5. To examine the problem of development employee productivity   for efficiency.

1.4     Relevant Research Questions

  1. Why is it that the objective of budget have not been achieved in public sectors?
  2. What are the causes of poor’ implement of budget?
  3. Why targeted goals or budget have never been meet in public sector.

1.5      Relevant Research Hypotheses

Hypothesis    1

Ho:      Resource  management   does not playa   significant  role in public  sector.

H1:      Resource management plays a significant role in public sector.

Hypothesis II

Ho:      Budget does not have any significant implication to the development of the public sector.

H1:       Budget has significant implication to the development of the public sector.

Hypothesis III

Ho:      The human resource management challenges in the public sector does not have any significant impact on the economic growth

H1:       The human resource management challenges in the public sector has significant impact on the economic growth

Hypothesis IV

Ho:      Most government spending has a negative economic impact

H1:       Most government spending has a positive economic impact

 

1.6     Significance of the Study

  1. The result of the work will help policy makers in the area of public finance to know how to tackle some of their problem which has been research on.
  2. It is also indeed anticipated that this research work will be of immense help to the academic and others who may fine study in valuable source of materials for their future research work.
  3. This research  will  help  to  correlate,  compare  and  coordinate  the  financial administration of the various government department.

 

1.7     Scope of the Study

The study is to assess the role of resource management on organizational development. The  study  will  be  restricted  to  Lagos  State particularly  in  Ifelodun  Local  Council Development Area of Ajegunle. Man, material, money and machines constitute the resources of an organization.

Data were collected and used based on records gotten from the organization and it only covered records on past years as relevant information which were supposed to be gotten based  on recent  and  current  events  were  not  given  due  to  problems  arising  in  the organization in form of mismanagement, fraud etc. Other materials are from textbooks, journals, periodicals, internet browsing etc will serve as the secondary source of data for the research study.

1.8 Operational   Definition  of Terms

Inordertowordanyformofambiguityasregardstothetermsusedinthisresearchwork, the following are given optional definition.

Human Resource Planning (HRP): This is the process of getting the right number of qualified people into the right job at the right time.

Productivity:Productivity is the measurement how well resources are brought together in organizations and utilized for accomplishing a set of results. Productivity is reaching the highest level of performance with the least expenditure of resources.

Organization:This is the process of dividing ‘work in to convenient tasks or duties or grouping such duties in the formal  posts delegation of authority to each post and approvingqualifiedstafftoberesponsiblethattheworkiscarriedoutasplanned.

Motivation: Motivation is the term used to describe those processes both instructive and rational by which people seek to satisfy the basic desires, perceived needs and personal goals which trigger human behaviour.

Forecasting: Is the process of estimating the future number of people required and the skills and competence they will need.

Material Management: This is defined as the grouping under one head all or some of the activities involved in the organization and use of materials employed from the need stage up to the storage of finishing goods.

Budget: A budget is a financial plan for a defined period of a years.

Sourcing: This is referred to the investigation and evaluation of courses of supply and suppliers.

Negotiation:  Is a process of planning, receiving and analyzing used by both buyer and seller to arrive at an acceptable agreement through common understanding.

Issue: issue is the withdrawal of goods and handover of some of user backed with authorized documents.

Financing Management: This is concern with the acquisitions, financing and management  of assets with some overall goal in mind or concerns with the planning and control of the firm’s financial resources.

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $15 for International clients.

Click here to Get this Complete Project Chapter 1-5

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!

Leave a Reply