ABSTRACT
Several studies on construction craft skills have identified a number of problems including ineffective training as responsible for shortages of craftsmen in the construction industry. In Nigeria, the problem of training craftsmen has been attributed to lack of a harmonised training framework. This research therefore examined existing training frameworks in craft skills training institutions and assessed the performance of the products of those institutions with a view to developing a harmonised framework for delivering effective training in Nigeria. Largely qualitative approach was adopted in conducting the research. Detailed literature review on training of craftsmen led to the development of a semi-structured interview guide which was used in conducting interviews in technical training institutions and construction organisations. In the technical institutions, senior management staff that specialised in technical training were interviewed while in the construction organisations, both management staff and craftsmen were interviewed. A total of six (6) training institutions were identified from a list of accredited technical training institutions published by the National Board for Technical Education and interviews conducted. For the construction organisations, nine (9) large construction firms were selected using purposive sampling and interviews were done with a management staff and three (3) craftsmen in each firm. Data obtained from the interviews were subjected to conceptual content analysis. The results showed the existence of different frameworks in each training institution with similarities, strengths and weaknesses. Other findings include the absence of direct collaboration between institutions and industry in delivering training; industrial training is poorly organised, supervised and the duration is inadequate; lack of prearrangement for the conduct of industrial training; training delivery is generic in most institutions regardless of the specific requirement of industries. Consequently, from the findings of the study, a harmonised framework for training construction craftsmen was developed which takes advantage of the strengths of the existing frameworks while minimising their weaknesses. The developed framework was validated using construction industry stakeholders. The study concludes that training of construction craftsmen can be delivered in a collaborative manner with all stakeholders in the construction industry performing roles based on their strategic advantage. It is recommended that sector specific technical training approach should be adopted and implemented in a collaborative manner for effective training; the developed framework for training of construction craftsmen should be adopted and implemented.

CHAPTER 1: INTRODUCTION

1.1 Background to the Study
The Construction Industry produces sky scrapers, roads, airports, ship yards, and several other structures. The production of these relies heavily on human and material resources. In terms of importance, Khalil and Lees (2006) ranked human resources higher than natural (material) and capital resources in both production and services process of an organisation. Additionally, Muya et al. (2006) argued that the quality of services offered by construction firms depend largely onthe quality of their workforce. Furthermore, of the workforce in the construction industry, the craft skills constitute the majority and execute most of the jobs because the industry is still manual labour intensive (Fellows et al., 2002). Regrettably, this class of human resource required by construction firms are in short supply in UK, Canada, USA, Asia and Africa (Agapiou et al., 1995a; Agapiou, 1998; Gann and Senker, 1998; Mckenzie, et al., 2000, Forde and MacKenzie, 2004; Datoegoem, 2006; Issam, 2006; McGuinness and Bannett, 2006; Muya et al., 2006; Chan and Dainty, 2007; Smith, 2009; Abdullahi, 2010; Kikwasi, 2011; Medugu et al.,
2011).

In order to make up for the shortfall in craft skills required in the construction industry, construction firms import craft skills from other countries or poach them from rival companies to improve their performance and out-play their competitors instead of training new ones (Agapiou et al., 1995a; Muya et al., 2006).

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

 

 

 

Need a Project Writer for a Different Topic

 

Full Project – DEVELOPING A HARMONISED FRAMEWORK FOR CONSTRUCTION CRAFT SKILLS TRAINING IN NIGERIA

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | Https://researchprojecttopics.com.ng

Frequently Asked Questions

How do I get my choice complete project on any topic?
Simply click on the Download button above and follow the procedure stated.
I have a fresh topic that is not on your website. How do I go about it?
Chat with us on WhatsApp or contact our Instant Help Desk for a custom research project on your topic.
How fast can I get this complete project on any project topic?
Within 15 minutes if you want this exact project topic without adjustment.
Is it a complete research project or just materials?
It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data.
What if I want to change the case study for this topic?
Chat with Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
How will I get my complete project?
Your Complete Project Material will be sent to your Email Address in Ms Word document format.
Can I get my Complete Project through WhatsApp?
Yes! We can send your Complete Research Project to your WhatsApp Number.
What if my Project Supervisor made some changes to a topic I picked from your website?
Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
Do you assist students with Assignment and Project Proposal?
Yes! Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
What if I do not have any project topic idea at all?
Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 708 7083 227.
How can I trust this site?
We are genuine and duly registered with the Corporate Affairs Commission. This site runs on Secure Sockets Layer (SSL), ensuring all transactions are highly secure and safe.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!