Full Project – THE ROLE OF PRIVATE PARTNERSHIP IN HOUSING FINANCE, DELIVERY AND MAINTENANCE IN NIGERIA

Full Project – THE ROLE OF PRIVATE PARTNERSHIP IN HOUSING FINANCE, DELIVERY AND MAINTENANCE IN NIGERIA

Click here to Get this Complete Project Chapter 1-5

THE ROLE OF PRIVATE PARTNERSHIP IN HOUSING FINANCE, DELIVERY AND MAINTENANCE IN NIGERIA

 

CHAPTER ONE

INTRODUCTION

 

1.1   BACKGROUND TO THE STUDY

The housing sector plays a more critical role in a nation’s welfare than is always recognized, as it directly affects not only the citizenry, but also the performance of other sectors of the economy. Adequate housing provision has since the early 1970s consequently engaged the attention of most countries, especially the developing nations for a number of reasons. First, it is one of the three most important basic needs of mankind- the others being food and clothing. Secondly, housing is a very important durable consumer item, which impacts positively on productivity, as decent housing significantly increases worker’s health and wellbeing, and consequently growth. Thirdly, it is one of the indices for measuring the standard of living of people across societies (Sanusi, 2003).

Propelled by the patriotic quest of addressing Nigeria’s acute housing problem, the Federal Government came up with a National Policy on Housing and Urban Development in 2002. The policy has since then triggered milestone reforms in the nation’s housing industry aimed at repositioning it for efficient and effective housing delivery and maintenance. One of the means through which the policy is been achieved is on public-private partnership concept. The thrust of the policy is to raise the home ownership rate among Nigerians to a respectable level by moving the housing industry to sustainably deliver mass, decent and affordable housing with the active participation of the private sector-driven mortgage based housing delivery and maintenance system (Oduwaye, 2004). The policy believes that this will particularly address the housing problem of most Nigerian citizens.

The concept of private partnership in housing financing, delivery and maintenance system is predicated on the pooling together of resources from the various stakeholders, each party making inputs, thereby minimizing wastage and maximizing results achieved. Ikekpeazu (2004) stressed that the expediency of the increased adoption of the public-private partnership for housing financing and delivery in the present socio-economic circumstances of shortage of housing in Nigeria is now even more glaring than ever. With the increasing demand of the population on the national economy and the government’s propensity for enlarging the multi-sectorial allocations in terms of finance, it is becoming obvious that government alone can no longer provide adequate housing for all categories of her citizens particularly the low income earners.

The organized private sector comprise of members of the real estate developers association of Nigeria and some commercial banks that have real estate departments. Average citizens including the low-income earners do not easily have access to housing finance because of their low wages. Nigeria is a country with high unequal income distribution, a situation that restricts the reach of the vast majority in the acquisitionof quality housing. This study examines the role of public-private partnership in housing finance, delivery and maintenance in Nigeria.

The public-private partnership for housing delivery under Nigeria’s current housing policy (Abdulsalam, 2008) confers certain identifiable roles on both the public and the private sector. The roles of the private sector in housing financing, delivery and maintenance with particular reference to private partnership includes responsible for production of physical houses, responsible for primary mortgage lending, required to invest mortgage securities and responsible for the production and supply of building materials, particularly local content.

1.2   STATEMENT OF THE PROBLEM

Housing finance constitutes one of the major pillars of housing delivery and maintenance system. Indeed, without a well-organized and efficient housing finance mechanism, the goal of a housing development and maintenance policy will be largely unattainable. Housing finance has been recognised as an important, almost indispensable factor in the housing delivery and maintenance system. This is because only the very few in any nation can afford to pay cash for a house or pay cash for a major renovation of the house. Most other people must have to finance their house building and maintenance through loans, personal savings, assistance from relatives or friends and gifts. Introduction of public-private partnership in housing delivery and maintenance is to enhance the productivity of the housing sector, increase housing affordability and improve access to basic infrastructure and social services. Ikekpeazu (2004) stressed that in order to attain the desired outcome for private partnership, the perception of the housing sector as a vast arena of social problems and a drain on the economy must change. Housing must be seen as an important economic sector with crucial linkages to the overall economy of a nation. The housing sector is a key component of the economy. It is typically the largest single form of fixed capital investment, in most economics. Based on these facts, the researcher seeks to examine the role of private partnership in house finance, delivery and maintenance in Nigeria.

1.3   OBJECTIVES OF THE STUDY

The following are the objectives of this study:

1.  To examine the role of private partnership in house finance, delivery and maintenance in Nigeria.

2.  To ascertain the level of investment in housing delivery and maintenance in Nigeria.

3.  To identify the problems of housing finance, delivery and maintenance in Nigeria.

1.4   RESEARCH QUESTIONS

1.  What is the role of private partnership in house finance, delivery and maintenance in Nigeria?

2.  What is the level of investment in housing delivery and maintenance in Nigeria?

3.  What are the problems of housing finance, delivery and maintenance in Nigeria?

1.5   HYPOTHESIS

HO: Private partnership has not contributed to housing finance, delivery and maintenance in Nigeria.

HA: Private partnership has contributed to housing finance, delivery and maintenance in Nigeria.

1.6   SIGNIFICANCE OF THE STUDY

The following are the significance of this study:

1.  The results of this study will educate the general public on the role of public private partnership and how it can be used as the instrument of development in housing finance, delivery and maintenance.

2.  The findings will sensitize the stakeholders in building construction and real estate management on the need for effective collaboration with the private sector to ensure speedy financing and delivery of housing units all over the country noting that private partnership has facilitated development in housing delivery and maintenance in other advanced countries of the world.

3.  This research will also serve as a resource base to other scholars and researchers interested in carrying out further research in this field subsequently, if applied will go to an extent to provide new explanation to the topic.

1.7   SCOPE/LIMITATIONS OF THE STUDY

 

This study on the role of private partnership in housing finance, delivery and maintenance in Nigeria will cover the involvement of private sector in the provision and maintenance of housing units with focus on the existing housing structure and management in Nigeria.

 

LIMITATION OF STUDY

1.  Financial constraint– Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

2.  Time constraint– The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

 

REFERENCES

 

Abdulsalam, A. (2008): Public-Private Partnership in Housing Finance at a seminar organised by the Nigerian Institute of Estate Surveyors and Valuers (Ondo State Branch), held on the 13th of November, 2008, at Owena-Nicon Luxury Hotels, Akure.

Ikekpeazu, F. (2004): New Trends in Low-cost Housing delivery systems in Nigeria: An Overview of the public-private partnership approach.  Housing Today, 1 (8), 30 – 36.

Oduwaye, L. (2004): Problems and Prospects of Primary Mortgage Institutions (PMIs) in Nigeria: Case of selected PMIs in Lagos. Housing Today, 1 (8) 14-18.

Sanusi, J. O. (2003): Mortgage Financing In Nigeria: Issues And Challenges, a paper presented at the 9th John Wood Ekpenyong Memorial Lecture, organised by the Nigerian Institute of Estate Surveyors and Valuers, January 29, 2003.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

 

 

 

Need a Project Writer for a Different Topic

Full Project – THE ROLE OF PRIVATE PARTNERSHIP IN HOUSING FINANCE, DELIVERY AND MAINTENANCE IN NIGERIA

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!