ABSTRACT

This research work has seriously analyzed procurement reforms act as tool for cost savings and accountability MKRPIC. Where the data was collected and used for the compilation of this research. An introduction was made which comprises the statement of general problem, the background of the subject matter, objectives of the study and the significance of the study. Existing literature on procurement reforms act, determination of needs, some purchasing objectives, purchasing practice and techniques, some management function were also discussed and reviewed. Random Sampling method was used as the basis of this study. A sample size of 39 out of total populations of 130 was selected. The research work shows that procurement reforms act n KRPC is always influenced or rather ineffective. The study recommends that due process should be complied with in order to enhance cost savings and accountability in KRPC. Also total commitment of the entire staff of KRPC.

 

CHAPTER ONE

INTRODUCTION

1.1   Background to the Study

In the past, huge sums of government money have been siphoned through the processes     of contract awards. A major thrust of this administration therefore, is the acceptance of Procurement Reforms Act as a tool for embracing transparency, competition, fairness, integrity, openness and value for money in the procurement reforms Act and seek the support of all governance for the implementation of the scheme in various ministries and government parastatals. The researcher intends to analyze on procurement reforms Act as a tool for cost savings and accountability in Kaduna Refining Petrochemical Company (KRPC) considering the several abuses to rules and standards in the award and execution of contracts. These abuses are in the form of over-invoicing, inflation of contract costs, proliferation of white elephant projects, poor project delivery, overpayment as well as manipulations of the processes leading to the award of contracts.

The Kaduna Refining and Petrochemical Company is in the business of refining Crude oil into valuable petroleum and petrochemical products and manufacturing and packaging products efficiently. And the way and manner in which procurement practices are carried out is of great concern to the researcher.

The edifice is a process plant designed to run steadily with minimum operating costs so as to make profit. In order to achieve this notable objective, it is imperative that replenishment drives are made to ensure that operational spare parts are readily available in the warehouse.

Since over seventy percent (70%) of the company’s expenditure is in the area of materials procurement. It is with this realization in mind that several efforts have been made by both corporate and the subsidiaries management to control and regulate materials management activities, especially in the area of procurement of materials in order to save cost and enhance company’s operations. In this project the terms procurement and purchasing would be used interchangeably.

The researcher developed interest to write on this topic because of personal interest in procurement reforms act and persona interaction with some staff who work in the procurement department under the umbrella of material management department (MMD) in Kaduna Refining and Petrochemical Company (KRPC).

The researcher got an insight into the procurement activities of the company the company and the problems facing them and therefore feels that it would be of great benefit to the company to conduct a detailed study into its purchasing departments with the aim of identifying the problems and after necessary suggestions toward the solution of such problems for effective and efficient operations of the company, Kaduna Refining and Petrochemical Company (KRPC).

1.2  Statement of the Problem

The Material Management Department (MM) of the KRPC Ltd operates in an integrated form to make materials available in the warehouses because the spare parts are stored. “JUST IN CASE” for timely maintenance intervention or as the need may arise. However, KRPC has taken a back seat in the implementation of the provisions of the Procurement Refining Act. Also, the statement of the general problem is the non-adoption of the Procurement Refining Act in KRPC Ltd.

And over the years there have been incessant cases where critical material needed for maintenance intervention and other requests, are either over-stocked, under-stocked or out of stock. The scenario depicts the existence of procurement deficiencies in the area of planning, replenishing, coding and inventory control which affects plant sustainability in KRPC Ltd. Besides 2008 annual stock taking in KRPC revealed the available materials to the value of N8 billion which could be used for other purposes.

1.3       Objectives of the Study

The study is geared towards achieving the following objectives:

· Outline the risks associated with non-implementation of the provisions of the procurement Act in KRPC Ltd.

· Determine the impact of the non-implementation of Procurement Reforms Act to the organization.

· Examine the factors responsible for the non-implementation of the Act in KRP Ltd.

· Suggest or proffer solutions to the problems.

1.4   Significance of the study

The benefits derivable under this study can be seen below:

·  It serves as a guide for the organization in which the researcher as chosen as a case study i.e. KRPC.

·  It is meant for students for are willing to embark on further studies in this perspective.

· It is a prerequisite for an award of Higher National Diploma (HND) in purchasing and supply.

1.5   Scope of the Study

The scope of this research work shall be limited to Kaduna Refining and Petrochemical Company particularly the department under the umbrella of material management department. The researcher also aimed at analyzing the procurement reform act as a tool for cost savings and accountability in KRPC. Also, comparative notes shall be made where necessary with other department within KRPC.

1.6       Research Questions

i)  What are the risks associated with the non-implementation of Procurement Reforms Act in KRPC?

ii) How does the non-implementation of the Procurement At affect the organization?

iii) What are the factors responsible for the non-implementation of the Procurement Reform Act?

iv)  What are the remedies for solving these problems?

1.7    Definition of Terms

–      Procurement: Means purchasing and/or supplies.

–      Supplier: This is the term used to describe a seller of goods or items in a given place.

– Inventory: This refers to the list of goods or items in a given place.

– Quotation: Is a list showing the prices of items.

– Purchase Order: It is an order in a printed firm to transmit the company’s requirement to supplies.

– Negotiation: Is a term used to arrive at a final and reasonable price.

– Specification: This is the information by the buyer to supplier indicating descriptions dimension and analysis performance of a product.

– Public Procurement: Means the acquisition by means of goods, works or services.

– Efficiency: Means the ability to minimize the use of resources in achieving organization’s objectives i.e. doing the right thing.

– Effective: Means producing the result that is wanted or intended.

– Due Process: Is a mechanism for ensuring strict compliance to rules and procedures that should guide contract award.

– BMPIU: Budget Monitoring and Price Intelligent Unit. This is the unit tasked with implementing Nigeria’s public procurement reform programmes.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

 

 

 

Need a Project Writer for a Different Topic

Full Project – AN ANALYSIS OF THE PROCUREMENT REFORMS ACT AS A TOOL FOR COST SAVINGS AND ACCOUNTABILITY

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!