Full Project – IMPACT OF EFFECTIVE STOCK KEEPING AND CONTROL IN AN ORGANIZATION

Full Project – IMPACT OF EFFECTIVE STOCK KEEPING AND CONTROL IN AN ORGANIZATION

Click here to Get this Complete Project Chapter 1-5

ABSTRACT

The effect of stock control in an organization is so vital in both large and small firm whether in the public or private sector. Serious operational and financial breakdowns can result if a good stock control system is not operated by the stores. Every stock control system must be designed to meet the particular needs of the organization. Stock control is set up in any organization to assists in the production of goods and service and no substantial size can be efficiently manage without it. The basic aim of every efficient manager is to reduce time and labour involved in each operation to the absolute minimum consistent with maintaining required quality.

 

CHAPTER ONE

1.0 INTRODUCTION 

1.1 BACKGROUND TO STUDY

For an organization to be successful, it depends on the efficient control of stock in that organization. Therefore, for the study of purchasing and supply to be successful or complete, there must be efficient control of stock. Store management is very closely liked with product and distribution and is much neglected area of business study. Yet stock control is a vital part of all industrial organization and it must be design to suit the particular needs of the organization. Stock control is set up in any organization to assist in the production of goods and services and no substantial size can be efficiently manage with out it. The basic aim of every manager is to reduce the time and labour involved in each operation to the absolute minimum consistent with maintaining the required quality. (Bin, 1952).

According to (Bim, 1952) stock control represents the clerical control of materials into and out of the stores, and all the level of stocks in the stores with due regard to the economy in storage as well as ordering cost, purchase price to agreed, and the level of organization working capital. The stock control process focuses attention on factors related to time utility location, quality and quality of materials used by the operations of the organization.

1.1 BACKGROUND OF THE STUDY

ROKANA INDUSTRY OWERRI 

Rokana Industry Owerri was established in the year 1998 by the former Manufacturing Association of Nigeria (MAN) President Engr Charles Ugwuh. The company is into manufacturing and production of goods and services. Its corporate headquarter is situated as t Victoria Island Land with manufacturing situated at different parts of the country which includes Owerri, Port Harcourt, Onitsha and recently Enugu. They produce good quality beverages and confectionaries for daily consumption. They produce quality post-boards companies adverts post boards, posters etc. Also they are into plastic/polymer production. The number of Rokana Products sent to the market, in no doubt has made tremendous impact on the reduction of the micro economic variables problems in this country through generating to our economy, creation of job opportunities etc. Efficient stock keeping has significantly improved profitability and productivity of Rokana Industry.

1.2 STATEMENT OF THE PROBLEM 

The efficient of stock control in an organization is so vital in both large and small firm upon the efficient of stock control. The researcher in carrying out this research work were able to identify some problems that hinder the progress of smooth control of stock in an organization. Some of the these problems are identified below: a. The method of sources of information used in the organization in terms of checking the control of stock is not encourage able in the sense it was done without considering if the individual has the capacity.

b. Professional were not employed in the purchasing departments and this makes the strategies involved in the efficient control of stock not to the work or job were not well trained. C. The efficient stock control records are not properly kept and this makes managers/keeper to be very active.  d. Another problem which hinders the progress of stock control in an organization is the type of materials purchased by the procurement manager. This implies that the material might be in a bad shape, thereby stops the smooth running of the organization.  e. Finally, the stock held in store for so long can cause a problem, in controlling the stock in an organization. This means, the stocks are not supposed to be kept in the stores for so long before they are dispatched to be they are needed.

1.3 OBJECTIVE OF THE STUDY 

Obviously, every organization according to Carter (1982:31) has its own needs and requirements which have to be met by its stock control system. However, if we look at the stock control in terms of average medium size production and distribution organization we will obtain a complete in selecting and operating stock control methods, control of level of stocks, the stock controller of the organization is seeking to achieve the following fundamental objectives:

1. To stress on the importance of stock control in an organization, thereby motivating the management to develop interest on the stock control function.

2. To highlight on the need of employing young and energetic employees for the purpose of stock control operations.

3. To lay emphasis on the importance of employing a workers of technical know-how on the current advancement of technology example computer.

4. Employing people with business experience knowledge for the purpose of transacting effective with suppliers and other department in another objectives.

5. To ensure there is efficient and effective stock control in the organization.

6. To control the inflow and outflow of the materials held in the organization.

1.4 RELEVANCE OF THE STUDY 

The relevance of stock control in an organization to know the various ways of controlling the stock held there firm/organization. Stock control is an important aspect of business management and must not be neglected by management. This is so because any management that neglects it control of stock will generally reduce its profit potential or even the level of service provided, shortage in inventory an as well as tools, for instance, will interrupt production, rendering machines and labour force idle and will further lead to losses in sales buying and over stocking of materials in inventory, the organizations fund will be tied up in stock and will represent cash that would have been used for other purpose.

1.5 RESEARCH QUESTION 

In other to a make a complete investigation of subject matter, the researcher has to come up with the following questions thus:

Question one: Does the store department have adequate number of staff?

Question two: Does you organization adopt and method to supply requirements of materials without holding stock?

Question three: Do you find out reason why customer waste much time in you company?

Question Four: Does your organization control there stock?

Question Five: What are the tools for stock and material control

Question Six: What are the process and procedures for stock control?

1.6 THE SCOPE OF THE STUDY 

In industries as well as in the public sector organization, the “stores” has remained as one of the production department and the storage, whether of raw materials, partly processed work or finished goods or products. In part of the sequences of operations both clerical and physical which starts as soon as the customer’s order or management decision to manufacture and is completed by the dispatch of a finished product. The major aim of every efficient manager is to reduce the rime and labour involved in each operation to the absolute minimum consistent with maintaining the required quality so as to achieve minimum output and reduce manufacturing cost.

In treating the stock control as an operation, the manager must have similar objects in mind, his aim in this regards is to ensure that every piece of material, whether raw or worked, coming into and store shall therefore be as short a time as possible before moving either out of the factory to be processed, or, in the case of such things spares, tools or building materials, into use. The essential qualifying condition here is that stock must be maintained just high enough for a constant supply of materials or components to be available when required.

1.7 THE LIMITATION OF THE TERMS OF STUDY 

An investigation of this kind is confronted with several limitation, its limitation are as follows: a. Financial Problem: Financing this project has been a trying experience, because of the prevailing economic condition in the society, so the researcher is unable to travel and cover many places of interest in order to gather comparable data of information for the research work. b. Limited time factor: Due to the schedule of academic activities for every final year students both in National Diploma of the polytechnic is lactic, the researcher needs to attend classes, read other courses that is related to her course of study, collect data/information from to the polytechnic which she would have loved to do but due to limited time factor, the researcher was unable to do so.

c. Natural factor: This also act as a hindrance to the study, this project work is disturbed from effects of regular rainfalls and hot whether, wind thereby, hinders the researcher’s movement in bid to collect data/information and distribution of questionnaires to respondents.  d. Transportation problem: The researcher was also confronted with transportation problems, he wasted so much time on the road or on the vehicle boarded, and thereby making her to reach her place of choice of information from the school libraries.

1.8 DEFINITION OF TERM 

For the purpose of enhancing the understanding key terms and concepts used in this researcher, here are the definition of terms and concepts used in the context and the meaning assigned to them for the purpose of this study. They include:

Efficient: This study means performing or functioning in the best possible manner with the least waste of material, time and effort; having and using requisite knowledge, skill and industry.

Store keeping: This is a process of ensuring stock held by the organization is supplied to those parts of the organization that needs them.

Organization: Refers to the combination of people or individuals efforts working in pursuit of certain common purpose.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

 

 

 

Need a Project Writer for a Different Topic

Full Project – IMPACT OF EFFECTIVE STOCK KEEPING AND CONTROL IN AN ORGANIZATION

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!