COMPLETE PROJECT-MAINTENANCE OF BUILDINGS OF PUBLIC INSTITUTIONS

COMPLETE PROJECT-MAINTENANCE OF BUILDINGS OF PUBLIC INSTITUTIONS

 

Click here to Get this Complete Project Chapter 1-5

ABSTRACT

A building fabric is referred to as an “environmental envelope” because it is the means by which the natural or external environment may be modified, to produce a satisfactory internal environment for man to live in. The deterioration of buildings hampers its ability to perform adequately, thus is important to ensure proper maintenance to prevent deterioration.

Public buildings represent significant investment of the tax payers’ money and therefore preserving these building systems is important. Due to the neglect of the maintenance component of the housing process in the country, a lot of public and private residential buildings are in a state of disrepair.

In view of the above, this study was designed to assess the current condition of public buildings, identify the underlying principal causes of poor maintenance of public buildings, analyse the maintenance policy and practice and capacity of the maintenance and estate departments of public institutions and make suggestions and recommendations towards the adoption of effective maintenance policy and innovations that would address the building maintenance problem in public institutions.

The field investigations focused on residential buildings of GPS, GHS nurses quarters and UEW-K. Three different housing types were defined for data collection and analyses including: bungalows, tenement houses and single unit houses. Through the application of multi-stage cluster sampling and purposive and random sampling techniques, 176 buildings were covered in the survey. The survey revealed that there is a real housing maintenance problem in public institutions in Ghana. The study revealed that on the whole, 83 percent of all residential buildings of public institutions surveyed have maintenance problems with maintenance problem being more prominent in GPS and UEW-K with 41.2 percent and 30.8 percent of their buildings in a bad condition, with 14.3 percent of those of GHS in the same situation.

Maintenance problems by housing types in public institution revealed that building maintenance problems are more pronounced in single unit houses than tenement houses and bungalows with 48.4 percent, 37.5 percent and 5 percent respectively in

iii

bad condition. However, tenement houses had the highest buildings with good condition, with 37.5 percent of all tenement houses surveyed in good condition requiring the least or no maintenance.

The study also established the following factors as being responsible for the poor maintenance of public buildings: The age of the buildings, Lack of maintenance culture, Inadequate funds and high maintenance cost, Pressure on building facilities by number of users and Poor construction work and maintenance work done by maintenance personnel of the institution. Stakeholders in the housing sector also added to the problem has arisen as a result of lack of preventive maintenance plan, low capacity of maintenance personnel in terms of staffing and training, absence of a national maintenance policy and apathy and lack of patriotism on the part of some public employees occupying government bungalows.

The study concludes by enumerating a number of recommendations aimed at providing the necessary framework for proper and effective maintenance of buildings. These are: the need for public institutions to embrace preventive maintenance practice as a high priority rather than adhoc maintenance. Managers are to oversee periodic inspections of buildings’ conditions and create an inventory of buildings’ components and equipment. Public institutions should ensure that their maintenance department is adequately staffed. There is also the need for a national policy on maintenance to be formulated to protect buildings, institution of a maintenance awards scheme for public institutions and establishing a maintenance fund to be managed for maintenance of public buildings in the country.

CHAPTER ONE

BACKGROUND TO THE STUDY AND PROBLEM CONTEXT

1.1 Introduction

Physical infrastructure constitutes a high proportion of the country’s investment. It is therefore of primary importance that these facilities which include public buildings are maintained in order that they can serve both the architectural and aesthetical functions for which they are built. The physical appearance of buildings housing public institutions in part constitutes the basis upon which the society makes their initial judgment of the quality of services to be offered.

One of the critical problems confronting the housing industry in Ghana is the poor maintenance practice (Afranie and Osei Tutu, 1999). The role of Public Institutions in National development cannot be over-emphasized. However, in spite of the heavy investment in public buildings, Public institutions allow their structures to care for themselves without any sustainable maintenance plan to preserve the quality of the buildings. The continued efficient and effective performance of public institutions depends on the nature of their buildings in addition to other factors such as enhanced conditions of service, provision of the requisite tools etc.

Public Institution buildings consist of both dwelling (residential accommodation) and non-dwelling (office accommodation). Both residential buildings as well as office buildings are prone to defects due to their permanent and lengthy usage. All elements of buildings deteriorate at a greater or lesser rate dependent on materials and methods of construction, environmental conditions and the use of the buildings (HMSO 1972).

According to Seeley 1987, neglect of maintenance has accumulative results with rapidly increasing deterioration of the fabric and finishes of a building accompanied by harmful effects on the contents and occupants. Therefore, buildings are too valuable assets to be neglected in this way. In his hierarchy of needs theory Maslow (1954) identifies five basic needs which are organized into successive level of importance in an ascending order. He identified physiological needs as the most

1

basic needs of human beings which include air, food, water, shelter (housing), sex and sleep.

BS 3811(1984), define ‘maintenance’ as “The combination of all technical and associated administrative actions intended to retain an item in, or restore it to, a state in which it can perform its required function.”

Maintenance brings about improved utilization of buildings ensuring the highest safety standards. It must be emphasized that more rather than less maintenance work is necessary if the value and amenity of the nation’s building stock was to be maintained. A good maintenance system is also a good disaster mitigation system. Moreover, a well operated system of maintenance for buildings and equipment has the effect of being a very effective disaster mitigation measure in terms of cost and facility usage. It ensures the most economic way to keep the building and equipment in the best of form for normal use, given the original design and materials (http\\www.oas.org\en\cdmp).

Maintenance, which can also be explained as the continuous protective care of the fabric, contents and settings of a place can be categorized according to why and when it happens, as corrective maintenance, which is necessary to bring a building to an accepted standard. Planned maintenance is work to prevent failure, which recurs predictably within the life of a building such as cleaning gutters or painting. Emergency Corrective Maintenance deals with work that must be initiated immediately for health, safety, security reasons or that may result in the rapid deterioration of the structure or fabric if not undertaken (for example, roof repairs after storm damage, graffiti removal, or repairing broken glasses).

When buildings are neglected, defects can occur which may result in extensive and avoidable damage to the building fabric or equipment. Poor maintenance has resulted in damage and deterioration to some public buildings in Ghana. Neglect of maintenance especially in relation to replacing electricity cables after thirty of use can also give rise to fire and safety hazards, which could result in the Institution owning the buildings being found liable for any injuries and damages. Another case in point is the Job 600 built by Ghana’s first President Dr. Kwame Nkrumah to host

2

the Organization of African Unity meeting in 1965 has its main building quite rundown and has been under renovation for many years now. The present state of this public building could be attributed to lack of maintenance and neglect after being put into use.

1.2 Problem Statement

Many Ghanaian public structures are often inadequately maintained and windows and doors and other building elements and facilities frequently show evidence of lack of maintenance and repair.

Some residential and office buildings of public institutions have not seen any significant maintenance or show little signs of maintenance since they were constructed, some dating back to the colonial era. This has resulted in such buildings being in a dilapidated state with some being abandoned. This lack of maintenance by the authorities and occupants of these facilities often leads to reduced lifespan of these buildings (Melvin, 1992), which invariably defeat the purpose for which they are put up i.e. to ensure that the nation’s stock of buildings, both as a factor of production and accommodation, was used effectively as possible.

The problem of ownership of these buildings, where occupants regard it not as their own property but a state property and handle it without due care largely have resulted in the state in which most public buildings find it. In some cases occupants do not recognize the building as their property and hence have passive attachment in relation to the efficient use and maintenance of the building.

Most offices, especially those outside the capital city, Accra, are dilapidated and lacked the basic necessities and facilities such as toilet due to its state of deterioration of a functioning office. However new buildings are being put up every now and then without giving a thought to the maintenance of the old structures which have been neglected. Frequent visits to the Ministries area of the Kumasi metropolis which houses these public institutions by this researcher depicts the abhorring situations in some public institutions with the buildings showing cracks on the walls, rotten wooden members, leaking roofs and missing louver blades, faded and discoloured surface coating (painting).

3

Lack of maintenance of some police buildings including police cells in recent times have resulted in jailbreaks in some police stations in the country leading to the escape of hardened criminals in custody, some educational institutions especially basic schools holding classes in the open air at the mercy of the weather.

Vital documents in some of these public institutions have not been spared due to poor or non-maintenance of the building. The dilapidated nature of the residential facility has also left the properties of the occupants at the mercy of the weather. These problems arising out of the present situation as far as maintenance of building in the public sector is concerned lowers morale of the labour force and goes a long way to reduce the efficiency of the personnel.

In view of these, it has been considered necessary to study the maintenance of public building in Ghana to identify the factors contributing to the current state of building in the public institutions since building owners are increasingly beginning to accept that it is not in their best interest to carry out maintenance in a purely reactive manner but that it should be planned and managed as efficiently as any other corporate activity.

1.3 Research Questions

In embarking upon such study, certain questions should be answered before any credible conclusions can be drawn. The following questions were posed.

1.      What are the current state/ level of non-maintenance of residential buildings of the public institutions in Ghana?

2.      What are the reasons or factors that have accounted for non maintenance of public buildings?

3.      What maintenance policies and practices are in place as far as public institutions are concerned and the capacity of human resource of their maintenance department?

4.      How can public institutions ensure continued maintenance of their buildings in order to retain their current stock of buildings as well as improve on their condition?

4

1.4 Research Objectives

1.4.1 General Objective

The study is generally expected to evaluate the building maintenance practices being employed in public institutions and its effect on the structure as the users of the building.

1.4.2 Specific Objectives of the study are to:

1.      Assess the current condition and state of buildings of public institutions

2.      Identify the underlying principal causes of poor maintenance of public buildings.

3.      Analyse the maintenance policy and practice and capacity of the maintenance department of public institutions.

4.      Make suggestions and recommendations towards the adoption of effective maintenance policy and innovations that would address the building maintenance problem in public institutions.

1.5 Research Justification

This study is essential in the sense that it would not only contribute to knowledge and theory, but will also contribute to good maintenance practice in the public institutions in Ghana. This is because the study will attempt to find out the factors that have contributed to the present state of non-maintenance of public buildings some of which have been abandoned due to its state of deterioration and recommend appropriate remedial actions to be taken.

Furthermore the study will assist managers of public institutions to become aware of the current state of their building infrastructure and its effect on the safety and health of personnel and also to put in place adequate innovative measures to prevent new buildings put up to suffer deterioration which ultimately lead to increased cost in restoring these buildings to their original state.

It will provide a critical and analytical perspective for appreciating the factors affecting the decisions to carry out maintenance. In addition, the study will bring to the fore the major inhibiting factors in the maintenance of public buildings in Ghana.

5

With increasing demand for efficiency and effectiveness from workers in the public sector by the populace, this study will attempt to establish the linkage between the present states of public buildings in relation to the social and economic impact to public workers.

1.6 Scope of the Study

The study was limited to residential buildings of selected public institutions in the Kumasi Metropolis of the Ashanti Region of Ghana. It examined the maintenance of residential buildings of the Ghana Police Service, the Ghana Health Service Nurses quarters and those of University of Education-Winneba, Kumasi campus.

1.7 Limitations of the Study

Data gathering suffered due to delay in getting responses due to the schedule of work of especially personnel of the GPS. In addition records keeping was a problem for all the institutions surveyed such that in some situation researcher had to collate the number of buildings himself. This also resulted in difficulty in identifying the buildings.

Notwithstanding the above limitations, the study results have not been affected and thus are credible, reliable and useful for any purposes of evaluation and feedback. This was made possible because researcher assisted especially the GPS in putting up a data base for its residential buildings in the study area.

1.8 Organisation of the Report

The study has been organized under five chapters. Chapter one, covers the introductory part and it includes the problem statement, research questions, objectives, significance of the study, the scope and the limitations. The second chapter deals with the review of relevant literature on the subject. Thus, ideas of some researchers and authors have been reviewed.

Chapter three focused on the methodology adopted in undertaking the research. The analysis of the data gathered is dealt with in chapter four, whilst chapter five presents a summary of the key findings, recommendations and conclusion.

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

Click here to Get The Complete Research Project Chapter 1-5


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://researchprojecttopics.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. researchprojecttopics.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://researchprojecttopics.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend Https://researchprojecttopics.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!